
Asbestos Materials SWMS
- 100% Compliant with Australian WHS Acts & Regulations
- Fully Editable MS Word & PDF Formats Included
- Pre-filled Content – Ready to Deploy Immediately
- Customisable – Easily Add Your Logo & Site Details
- Includes 2 Years of Free Compliance Updates
Two Ways to Get Started
Upload your logo and company details — we'll customise all your documents automatically.
Download the Word template and edit directly.
Product Overview
This Asbestos Materials Safe Work Method Statement (SWMS) is designed to identify, control, and minimise risks associated with working with or around asbestos-containing materials on Australian worksites. It is a comprehensive, pre-filled document that supports WHS compliance and provides end-to-end risk controls for the safe identification, handling, removal, and disposal of asbestos materials.
Activities & Specific Tasks Covered
This document includes specific risk controls for:
- Identification and preliminary assessment of suspected asbestos-containing materials (ACM) prior to work commencing
- Reviewing asbestos registers, surveys, and site-specific information before accessing work areas
- Planning and sequencing work to avoid disturbing asbestos where possible and to minimise fibre release
- Selection and correct use of personal protective equipment (PPE), including respiratory protective equipment suitable for asbestos tasks
- Setting up exclusion zones, barricades, and warning signage to restrict access to asbestos work areas
- Safe methods for minor, non-friable asbestos disturbance (e.g. drilling, cutting, or fixing into ACM under controlled conditions)
- Use of wet methods, hand tools, and other techniques to minimise dust and airborne asbestos fibres
- Handling, bagging, wrapping, and labelling asbestos waste in accordance with regulatory requirements
- Decontamination procedures for workers, tools, and equipment leaving the asbestos work area
- Emergency response to accidental asbestos disturbance or suspected fibre release incidents
- Health monitoring considerations and communication of asbestos risks to workers and other persons on site
- Coordination with licensed asbestos removalists and hygienists where higher-risk asbestos work is identified
Who is this for?
This SWMS is designed for builders, maintenance personnel, electricians, plumbers, HVAC technicians, facility managers, demolition contractors, and site supervisors who may work with or around asbestos materials on Australian worksites.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| 1. Preparation |
|
| 2. Identification |
|
| 3. Removal Planning |
|
| 4. Establishing Work Area |
|
| 5. Personal Protective Equipment (PPE) |
|
| 6. Isolation |
|
| 7. Wetting ACMs |
|
| 8. Asbestos Removal |
|
| 9. Decontamination |
|
| 10. Waste Disposal |
|
| 11. Air Monitoring |
|
| 12. Documentation |
|
Need to add specific site requirements?
Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.
Legislation & References
This document was researched and developed to align with:
- How to Safely Remove Asbestos Code of Practice – guidance on planning, preparation, and safe asbestos removal practices
- Managing Asbestos and Manufactured Mineral Fibres Code of Practice – requirements for identifying, managing, and controlling asbestos risks in workplaces
- Work Health and Safety Act 2011
- Work Health and Safety Regulations 2017
Standard SWMS Features (Click to Expand)
- Operational guidelines, with a step-by-step approach to safe work
- Possible hazards that may be encountered
- Step-by-step safety procedures to follow
- Before work starts – Guidelines and Checks
- Safety measures and guides
- Operational Safety Checks
- Before and After Risk Ratings
- Risk Assessment Matrix
- High Risk Work Involved
- Emergency Evacuation Procedure
- Plant and Equipment
- Qualifications and Permits
- Specific Personal Protective Equipment (PPE)
- Company Personnel Sign-off form
Suitable for Industries
$96.8
Includes all formats + 2 years updates

Asbestos Materials SWMS
- • 100% Compliant with Australian WHS Acts & Regulations
- • Fully Editable MS Word & PDF Formats Included
- • Pre-filled Content – Ready to Deploy Immediately
- • Customisable – Easily Add Your Logo & Site Details
- • Includes 2 Years of Free Compliance Updates
Asbestos Materials SWMS
Product Overview
This Asbestos Materials Safe Work Method Statement (SWMS) is designed to identify, control, and minimise risks associated with working with or around asbestos-containing materials on Australian worksites. It is a comprehensive, pre-filled document that supports WHS compliance and provides end-to-end risk controls for the safe identification, handling, removal, and disposal of asbestos materials.
Activities & Specific Tasks Covered
This document includes specific risk controls for:
- Identification and preliminary assessment of suspected asbestos-containing materials (ACM) prior to work commencing
- Reviewing asbestos registers, surveys, and site-specific information before accessing work areas
- Planning and sequencing work to avoid disturbing asbestos where possible and to minimise fibre release
- Selection and correct use of personal protective equipment (PPE), including respiratory protective equipment suitable for asbestos tasks
- Setting up exclusion zones, barricades, and warning signage to restrict access to asbestos work areas
- Safe methods for minor, non-friable asbestos disturbance (e.g. drilling, cutting, or fixing into ACM under controlled conditions)
- Use of wet methods, hand tools, and other techniques to minimise dust and airborne asbestos fibres
- Handling, bagging, wrapping, and labelling asbestos waste in accordance with regulatory requirements
- Decontamination procedures for workers, tools, and equipment leaving the asbestos work area
- Emergency response to accidental asbestos disturbance or suspected fibre release incidents
- Health monitoring considerations and communication of asbestos risks to workers and other persons on site
- Coordination with licensed asbestos removalists and hygienists where higher-risk asbestos work is identified
Who is this for?
This SWMS is designed for builders, maintenance personnel, electricians, plumbers, HVAC technicians, facility managers, demolition contractors, and site supervisors who may work with or around asbestos materials on Australian worksites.
Specific Job Steps & Hazards Covered
| Job Step / Activity | Potential Hazards |
|---|---|
| 1. Preparation |
|
| 2. Identification |
|
| 3. Removal Planning |
|
| 4. Establishing Work Area |
|
| 5. Personal Protective Equipment (PPE) |
|
| 6. Isolation |
|
| 7. Wetting ACMs |
|
| 8. Asbestos Removal |
|
| 9. Decontamination |
|
| 10. Waste Disposal |
|
| 11. Air Monitoring |
|
| 12. Documentation |
|
Need to add specific site requirements?
Don't worry if a specific job step isn't listed above. Once you purchase, simply log in to your Client Portal and add your own custom job steps at no extra cost. We take care of the hard work—creating the hazards and control measures for free—to ensure your document is compliant within minutes.
Legislation & References
This document was researched and developed to align with:
- How to Safely Remove Asbestos Code of Practice – guidance on planning, preparation, and safe asbestos removal practices
- Managing Asbestos and Manufactured Mineral Fibres Code of Practice – requirements for identifying, managing, and controlling asbestos risks in workplaces
- Work Health and Safety Act 2011
- Work Health and Safety Regulations 2017
Standard SWMS Features (Click to Expand)
- Operational guidelines, with a step-by-step approach to safe work
- Possible hazards that may be encountered
- Step-by-step safety procedures to follow
- Before work starts – Guidelines and Checks
- Safety measures and guides
- Operational Safety Checks
- Before and After Risk Ratings
- Risk Assessment Matrix
- High Risk Work Involved
- Emergency Evacuation Procedure
- Plant and Equipment
- Qualifications and Permits
- Specific Personal Protective Equipment (PPE)
- Company Personnel Sign-off form
$96.8