Working With Liquid Manure Safe Work Method Statement (SWMS)

$96.80

The Working With Liquid Manure Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Working With Liquid Manure Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Working With Liquid Manure Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Working With Liquid Manure Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Working With Liquid Manure Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Working With Liquid Manure Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Working With Liquid Manure Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips and falls
    • Manure splash or splatter
  • 2. Equipment Check
    • Equipment failure
    • Inadequate personal protection
  • 3. Manure Handling
    • Methane gas exposure
    • Chemical burns
  • 4. Transporting Manure
    • Overturning and spilling
    • Traffic accidents
  • 5. Manure Spreading
    • Dust and aerosol exposure
    • Noise pollution
  • 6. Cleanup Operations
    • Poor hygiene control
    • Chemical residue exposure
  • 7. Repairs And Maintenance
    • Electrical faults
    • Tool injury risks
  • 8. Waste Disposal
    • Improper waste handling
    • Contamination risks
  • 9. Refuelling Machinery
    • Fuel spills or fires
    • Chemical burn
  • 10. PPE Removal And Cleaning
    • PPE contaminated with manure
    • PPE handling risks
  • 11. Decontamination Of Area
    • Inadequate cleaning chemicals
    • Exposure to bacteria
  • 12. Reporting And Documentation
    • Incomplete records
    • Miscommunication of risks
  • 13. Manure Storage
    • Leakage
    • Exposure to harmful gases
  • 14. Emergency Response Training
    • Inadequate training
    • Mistakes during emergency response
  • 15. Monitoring And Reviewing Safety Processes
    • Non-compliance risk
    • Ineffective safety measures

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working With Liquid Manure Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart