Working With Large Format Digital Print Machinery Safe Work Method Statement (SWMS)

$96.80

The Working With Large Format Digital Print Machinery Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Working With Large Format Digital Print Machinery Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Working With Large Format Digital Print Machinery Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Working With Large Format Digital Print Machinery Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Working With Large Format Digital Print Machinery Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Working With Large Format Digital Print Machinery Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Working With Large Format Digital Print Machinery Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate training
    • Electrical shock from machinery
  • 2. Loading Material
    • Heavy lifting injuries
    • Trap injuries with rollers
  • 3. Calibration
    • Electrical shock
    • Exposure to harmful light source
  • 4. Print set up
    • Chemical exposure from ink
    • Computer screen glare
  • 5. Printing
    • Noise exposure
    • Vapours from printing process
  • 6. Maintenance
    • Electrical shock
    • Cuts and burns from hot parts
  • 7. Unloading Prints
    • Manual handling injuries
    • Slip/Trip hazards
  • 8. Cleaning Up
    • Exposure to cleaning chemicals
    • Slippery floors
  • 9. Waste Disposal
    • Exposure to hazardous waste
    • Cut injuries from disposal
  • 10. Material Stocking
    • Heavy lifting injuries
    • Falling Objects
  • 11. Quality Inspection
    • Strain while inspecting prints
    • Chemical exposure
  • 12. Print Packaging
    • Cuts from packaging material
    • Manual handling injuries
  • 13. Machine Shutdown
    • Electrical shock
    • Burn from residual heat
  • 14. Reporting Faults
    • Stress from incident reporting
    • Potential for missed faults
  • 15. Emergency Procedures
    • Panic during emergency situations
    • Incomplete evacuations
  • 16. Equipment Storage
    • Heavy lifting injuries
    • Falling Objects
  • 17. Documentation & Compliance
    • Lost documents
    • Data security breaches
  • 18. Training Revamp
    • Incomplete or incorrect training dissemination
    • Non-adherence to revised protocols
  • 19. Performance Review
    • Stress from review results
    • Miscommunication
  • 20. Preventive Measures Planning
    • Inadequate preventive planning
    • Overlooking potential threats

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working With Large Format Digital Print Machinery Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart