Working With Demolished Plasterboard Safe Work Method Statement (SWMS)

$96.80

The Working With Demolished Plasterboard Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Working With Demolished Plasterboard Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Working With Demolished Plasterboard Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Working With Demolished Plasterboard Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Working With Demolished Plasterboard Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Working With Demolished Plasterboard Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Working With Demolished Plasterboard Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Safety hazards
    • Health hazards
  • 2. Removal of Plasterboard
    • Physical strain
    • Inhalation of dust
  • 3. Material Handling
    • Sharp Object injuries
    • Muscular strain
  • 4. Loading into Waste Management
    • Injury from heavy lifting
    • Slipping or falling
  • 5. Cleaning the Workplace
    • Exposure to harmful substances
    • Slip and trip hazards
  • 6. Transporting to the Disposal Site
    • Falling objects
    • Vehicle accidents
  • 7. Unloading at Disposal Site
    • Heavy lifting injuries
    • Falling objects
  • 8. Safe Return of all Equipment
    • Electrical safety risks
    • Tripping hazards
  • 9. Decontamination and Cleanup
    • Chemical exposure
    • Biological hazards
  • 10. Completion and Review
    • Overlooked hazards
    • Improper procedure follow-ups
  • 11. Maintenance and Repair
    • Electric shock
    • Cutting or pinch hazards
  • 12. Regular Inspection
    • Mishandling equipment
    • Inadequate knowledge
  • 13. Training and Awareness
    • Risks due to unawareness or negligence
    • Communication gaps
  • 14. Documentation and Reporting
    • Non-compliance to regulations
    • Miscommunication
  • 15. Emergency Preparedness
    • Insufficient resources
    • Lack of preparedness
  • 16. Contingency Planning
    • Unprepared for unexpected events
    • Mismanagement during emergencies
  • 17. Auditing and Improvement
    • Non-compliance
    • Ignorance of safety rules
  • 18. Revision and Update
    • Outdated information
    • Inapplicable procedures
  • 19. Communication and Consultation
    • Misinterpretation
    • Poor communication
  • 20. Follow-up and Closure
    • Delayed actions
    • Inadequate resolution

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working With Demolished Plasterboard Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart