Working Over 2 Meters on Top of Cold Room and Freezer Safe Work Method Statement (SWMS)

$96.80

The Working Over 2 Meters on Top of Cold Room and Freezer Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Working Over 2 Meters on Top of Cold Room and Freezer Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

“`html

Safe Work Method Statement Template for Working Over 2 Meters on Top of Cold Rooms and Freezers

If you’re in the business of ensuring workplace safety, particularly in environments as specific as working over 2 meters on top of cold rooms and freezers, our Safe Work Method Statement (SWMS) Template is designed just for you. Here’s what you can expect:

  • Pre-filled and Comprehensive: We’ve done the hard work for you. Our SWMS template comes pre-filled with detailed information you’ll need, eliminating the guesswork and saving you precious time.
  • Fully Editable and Customisable: Available in Microsoft Word format, the template is easy to edit and tailor to suit your specific project needs. Adjust any section to make it fit exactly how you want it.
  • Includes Scope of the Project and Project Details: Clearly define the scope and specifics of your project. This makes it simpler to communicate essential details to all involved parties.
  • Checklist of High-Risk Machinery: A handy checklist that ensures you’re aware of any high-risk machinery on-site, making it easier to plan safety measures around them.
  • Space for Recording Staff Training: Keep track of who has undergone the necessary training with designated spaces to record this vital information.
  • Before and After Risk Ratings: Understand the impact of your safety measures with sections dedicated to recording risk ratings before and after implementing the SWMS.
  • Resources for Legislative References: Includes resources that point you to important legislative references, helping you stay compliant with the law.
  • All Required PPE Included: Lists all necessary Personal Protective Equipment (PPE), so you won’t overlook these essential items.
  • Risk Assessment and Risk Assessment Matrix: Conduct thorough risk assessments using the included matrix, guiding you through identifying potential hazards and assessing their severity.
  • Implementation Checklist: Ensures that all requirements have been covered when implementing the SWMS, leaving no stone unturned.
  • Sign-off Page for All Workers and Responsible Persons: Facilitates accountability and ensures everyone is on the same page with a sign-off section for all workers and responsible persons.
  • Easy to Use, Easy to Customise: User-friendly design that anyone on your team can understand and use effectively, without any steep learning curve.
  • Suitable for Large Contracts and Tenders: Perfect for large contracts, including tier 1 contractual work, ensuring you’re well-prepared for significant projects.
  • Quick Delivery by Email: No waiting around—get your template delivered straight to your inbox swiftly and start enhancing workplace safety right away.

“`


The Working Over 2 Meters on Top of Cold Room and Freezer Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slip
    • Trip
  • 2. Inspection
    • Fall from height
    • Structural integrity
  • 3. Setup Ladder
    • Incorrect ladder setup
    • Slip
  • 4. Accessing Roof
    • Falling
    • Ladder stability
  • 5. Securing Harness
    • Faulty harness
    • Lack of proper anchorage
  • 6. Positioning Tools
    • Dropping tools
    • Improper handling
  • 7. Working on Edge
    • Loss of balance
    • Unstable surfaces
  • 8. Weather Conditions
    • Wind
    • Rain
  • 9. Electrical Safety
    • Electrical faults
    • Damaged equipment
  • 10. Handling Materials
    • Lifting strain
    • Material falling
  • 11. Communication
    • Miscommunication
    • Emergency signals
  • 12. Site Security
    • Unauthorized access
    • Poor lighting
  • 13. Emergency Procedures
    • Lack of first aid
    • Emergency response delay
  • 14. Tool Maintenance
    • Faulty tools
    • Improper inspections
  • 15. Dismantling Setup
    • Falling objects
    • Improper techniques
  • 16. Debriefing
    • Insufficient briefing
    • Missed hazards
  • 17. Documentation
    • Incomplete records
    • Data inaccuracies
  • 18. Waste Disposal
    • Sharp objects
    • Chemical exposure
  • 19. Transporting Equipment
    • Loading injuries
    • Vehicle movements
  • 20. Final Inspection
    • Missed defects
    • Verification errors

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working Over 2 Meters on Top of Cold Room and Freezer Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart