Working On Or Near Roads Without Traffic Controls Safe Work Method Statement (SWMS)

$96.80

The Working On Or Near Roads Without Traffic Controls Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Working On Or Near Roads Without Traffic Controls Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Working On Or Near Roads Without Traffic Controls Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Working On Or Near Roads Without Traffic Controls Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Working On Or Near Roads Without Traffic Controls Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Working On Or Near Roads Without Traffic Controls Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Working On Or Near Roads Without Traffic Controls Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips
    • falls
    • poor visibility
  • 2. Site Assessment
    • Traffic
    • uneven surfaces
  • 3. Sign Installation
    • Manual handling injuries
    • tool misuse
  • 4. Equipment Setup
    • Electrical hazards
    • improper lifting technique
  • 5. Establish Safe Zone
    • Inadequate barriers
    • incorrect signage placement
  • 6. Hazard Identification
    • Missed hazards
    • inadequate risk assessment
  • 7. Traffic Management
    • Vehicle collisions
    • pedestrian interference
  • 8. Communication Plan
    • Miscommunication
    • language barriers
  • 9. Worker Briefing
    • Information overload
    • lack of understanding
  • 10. PPE Allocation
    • Inappropriate PPE
    • PPE misuse
  • 11. Implement Controls
    • Ineffective controls
    • delay in implementation
  • 12. Work Execution
    • Fatigue
    • distractions
  • 13. Emergency Plan
    • Delayed response
    • inadequate training
  • 14. Continuous Monitoring
    • Complacency
    • equipment failure
  • 15. Incident Reporting
    • Underreporting
    • ineffective communication procedure
  • 16. Post-Work Audit
    • Overlooking small issues
    • incomplete documentation
  • 17. Demobilisation
    • Rushing tasks
    • site cleanliness
  • 18. Equipment Check
    • Faulty equipment
    • missed maintenance
  • 19. Worker Debrief
    • Unaddressed concerns
    • failure to provide feedback
  • 20. Documentation
    • Incomplete record keeping
    • data loss

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working On Or Near Roads Without Traffic Controls Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart