Working Near Old Or Unstable Buildings Safe Work Method Statement (SWMS)

$96.80

The Working Near Old Or Unstable Buildings Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Working Near Old Or Unstable Buildings Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Working Near Old Or Unstable Buildings Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Working Near Old Or Unstable Buildings Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Working Near Old Or Unstable Buildings Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Working Near Old Or Unstable Buildings Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Working Near Old Or Unstable Buildings Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Exposure to harmful substances
    • risk of falling debris
  • 2. Safety briefing
    • Lack of knowledge
    • inadequate safety gear
  • 3. Site inspection
    • Risk of collapsing structures
    • uneven walking surfaces
  • 4. Equipment set-up
    • Equipment malfunction
    • inadequate safety features
  • 5. Area cordoning
    • Risks associated with crowd control
    • traffic management
  • 6. Building stabilisation
    • Structural instability
    • risk of collapse
  • 7. Debris removal
    • Risk of injury from falling or loose debris
    • exposure to hazardous materials
  • 8. Salvaging operations
    • Risk of instability
    • exposure to hazardous materials
  • 9. Testing stability
    • Inadequate testing equipment
    • structural instability
  • 10. Structural repair
    • Falling from heights
    • exposure to harmful dust
  • 11. Disposal of waste materials
    • Exposure to hazardous substances
    • improper waste disposal methods
  • 12. Final site assessment
    • Overlooking critical damage
    • inadequate assessment
  • 13. Regular maintenance
    • Risks associated with improper procedures
    • overlooking areas in need of repair
  • 14. Emergency procedures
    • Inadequate training
    • lack of emergency equipment
  • 15. Review and Reporting
    • Improper data recording
    • overlooking critical findings
  • 16. Safety debriefing
    • Lack of understanding
    • inadequate PPE
  • 17. Equipment storage
    • Inadequate storage conditions
    • damage to equipment
  • 18. Site clean-up
    • Exposure to harmful substances
    • injury from handling waste materials
  • 19. Follow up inspections
    • Risk of overlooked damage
    • inadequate inspection
  • 20. Documentation and Reporting
    • Risks associated with overlooking critical data
    • incorrect documentation

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working Near Old Or Unstable Buildings Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart