Working In Confined Spaces (Eave Cavities, Etc) Safe Work Method Statement (SWMS)

$96.80

The Working In Confined Spaces (Eave Cavities, Etc) Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Working In Confined Spaces (Eave Cavities, Etc) Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Working In Confined Spaces (Eave Cavities, Etc) Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Working In Confined Spaces (Eave Cavities, Etc) Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Working In Confined Spaces (Eave Cavities, Etc) Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Working In Confined Spaces (Eave Cavities, Etc) Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Working In Confined Spaces (Eave Cavities, Etc) Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Exposure to hazardous substances
    • Lack of adequate ventilation
  • 2. Inspection
    • Slips and falls
    • Encountering exposed wires
  • 3. Entry into confined space
    • Risk of falling
    • Exposure to hazardous substances
  • 4. Work in confined space
    • Low visibility
    • Poor ventilation
    • Physical injury due to tools/equipment
  • 5. Using equipment or tools
    • Risks of cuts or abrasions
    • Noise exposure
    • Electrical hazards
  • 6. Removing waste
    • Risk of muscle sprain/strain during handling of load
    • Exposure to hazardous waste
  • 7. Exit from confined space
    • Trips and falls
    • Head injuries from protruding objects
  • 8. Cleanup
    • Exposure to hazardous substances
    • Risk of slips with cleaning fluids
  • 9. Debriefing or job evaluation
    • Psychological stress if not managed properly
  • 10. Respiratory Protection usage
    • Risk of improper use or mask failure
    • Risk of exposure to airborne particles
  • 11. Lifting equipments
    • Strains and sprains
    • Dropping equipment or material on self
  • 12. Dealing with emergencies
    • Inadequate response or first-aid measures
    • Lack of access for emergency services
  • 13. Safeguarding and Labelling areas
    • Inadequate safeguarding measures
    • Incorrect labelling leading to confusion
  • 14. Monitor Atmosphere
    • Inadequate monitoring leading to unknown risks
    • Unavailability of monitoring tools
  • 15. Work Posture
    • Acute/chronic injuries
    • Fatigue
    • Musculoskeletal disorders
  • 16. Breaks
    • Inadequate rest leading to fatigue
    • Unsupervised resources during the breaks
  • 17. Regular Communication
    • Distraction causing accidents
    • Communication gap leading to mishaps
  • 18. Illumination
    • Poor visibility causing accidents
    • Glare caused by improper lighting source
  • 19. Tool maintenance
    • Faulty or failing equipment
    • Accidental activation or release of stored energy
  • 20. Closing Job
    • Remnant hazards
    • inadequate recording or reporting of incidents that occurred during work

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working In Confined Spaces (Eave Cavities, Etc) Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart