Working Around Pipes And Ductwork Safe Work Method Statement (SWMS)

$96.80

The Working Around Pipes And Ductwork Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Working Around Pipes And Ductwork Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Working Around Pipes And Ductwork Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Working Around Pipes And Ductwork Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Working Around Pipes And Ductwork Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Working Around Pipes And Ductwork Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Working Around Pipes And Ductwork Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect use of tools
    • Unidentified services like gas or electricity
  • 2. Site Inspection
    • Slips
    • trips and falls
    • Falling objects
  • 3. Setting Up Equipment
    • Electrical hazards
    • Trapping or crushing injuries
  • 4. Removal of OLD Pipes/Ducts
    • Exposure to dust or asbestos
    • Sharp edges
  • 5. Installation of NEW Pipes/Ducts
    • Manual handling issues
    • Falls from heights
  • 6. Insulation of Pipes/Ductwork
    • Heat burns or cold injuries
    • Exposure to hazardous substances
  • 7. Pressure Testing
    • Explosion
    • Release of Hazardous Substances
  • 8. Flushing/Cleaning
    • Exposure to chemicals
    • Slips on wet floors
  • 9. Dismantling Equipment
    • Trapping or crushing injuries
    • Electrical hazards
  • 10. Waste Management
    • Trips over waste material
    • Exposure to hazardous substances
  • 11. Servicing/Repairing
    • Exposure to live services
    • Unsuitable tools or equipment
  • 12. Routine Maintenance
    • Incorrect use of tools
    • Falling objects
  • 13. Material Handling
    • Manual handling issues
    • Falling objects
  • 14. Noise/Vibration Control
    • Noise Induced Hearing Loss
    • Hand-arm Vibration Syndrome
  • 15. Emergency Response
    • Less knowledge about exits
    • Slow response leads to harm
  • 16. Document Control
    • Incorrect identification of hazards
    • Lack of supervision
  • 17. Final Inspection
    • Missed hazards
    • Incorrect completion of tasks/repairs
  • 18. Pack Up & Clean Up
    • Trips over waste material
    • Manual handling issues
  • 19. Review and Monitor
    • Improvement or updating needed
    • Not following procedures
  • 20. Debriefing and Feedback
    • No feedback system
    • Miscommunication

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Working Around Pipes And Ductwork Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart