Work On Assembled Components In A Pit Area Safe Work Method Statement (SWMS)

$96.80

The Work On Assembled Components In A Pit Area Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Work On Assembled Components In A Pit Area Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Work On Assembled Components In A Pit Area Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Work On Assembled Components In A Pit Area Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Work On Assembled Components In A Pit Area Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Work On Assembled Components In A Pit Area Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Work On Assembled Components In A Pit Area Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips and falls
    • Back injury from manual lifting
  • 2. Accessing Pit
    • Working at heights
    • Falling objects
  • 3. Installing Safety Barriers
    • Incorrect installation
    • Falls from height
  • 4. Inspection of the Pit Area
    • Exposure to asbestos
    • Slips
    • trips
    • and falls
  • 5. Lowering Assembled Components
    • Equipment failure
    • Caught between / pinching
  • 6. Securing the Area
    • Pedestrian hit by vehicles
    • Equipment left unsecured
  • 7. Work on Assembled Components
    • Electrical shock
    • Failure of equipment
  • 8. Inspect Completed Work
    • Fall from height
    • Equipment failure
  • 9. De-energise Machinery
    • Electric shock
    • Fire or explosion
  • 10. Sign off on Completed Work
    • Inaccurate record keeping
    • Missed hazard identification
  • 11. Handover to Operations
    • Unclear communication
    • Failure to follow procedures
  • 12. Dismantling Safety Barriers
    • Incorrect dismantling
    • Falls from height
  • 13. Exiting Pit
    • Slips
    • trips and falls
    • Working at heights
  • 14. Clean up area
    • Improper waste disposal
    • Exposure to hazardous materials
  • 15. Document Reporting
    • Inaccurate record keeping
    • Missed hazard identification
  • 16. Review Safety procedures
    • Inadequate follow-up
    • Failure to identify hazards for improvement
  • 17. Staff Debrief
    • Poor communication
    • Misunderstanding of tasks
  • 18. Return of borrowed equipment
    • Misplacement of equipment
    • Equipment damage
  • 19. Disposal of Waste and Hazardous Materials
    • Improper waste disposal
    • Exposure to hazardous materials
  • 20. Lock out/Tag out
    • Machinery re-energised prematurely or by accident
    • Electric shock

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Work On Assembled Components In A Pit Area Safe Work Method Statement (SWMS) references: