Work Around Substandard Structures Safe Work Method Statement (SWMS)

$96.80

The Work Around Substandard Structures Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Work Around Substandard Structures Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Work Around Substandard Structures Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Work Around Substandard Structures Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Work Around Substandard Structures Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Work Around Substandard Structures Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Work Around Substandard Structures Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate training
    • Poor condition of tools
  • 2. Assessment
    • Lack of proper information
    • Ineffective communication
  • 3. Site Setup
    • Exposure to harmful substances
    • Slips
    • trips and falls
  • 4. Equipment Check
    • Faulty equipment
    • Inadequate maintenance
  • 5. Start of Work
    • Incorrect operation
    • Over-exertion/strain
  • 6. On-Going Checks
    • Overlooking hazards
    • Complacency
  • 7. Handling Materials
    • Manual handling risks
    • Mishandling dangerous substances
  • 8. Use of Machinery
    • Operator error
    • Equipment malfunctions
  • 9. Working at Height
    • Falls from height
    • Dropped objects
  • 10. Electrical Works
    • Electrical shocks
    • Fire risk
  • 11. Dealing with Hazards
    • Improper hazard response
    • Inadequate protective equipment
  • 12. Breakdowns/Malfunctions
    • Poor emergency response
    • Additional exposure to hazards
  • 13. Clean-Up Procedures
    • Improper disposal
    • Exposure to waste
  • 14. Signal Shutdown
    • Poor communication
    • Lack of protocol adherence
  • 15. Equipment Storage
    • Theft or vandalism
    • Damage through mishandling
  • 16. Review & Reporting
    • Missing potential risks
    • Underestimation of residual risks
  • 17. Periodic Maintenance
    • Delays
    • Inadequate servicing
  • 18. Site Demolition
    • Exposure to harmful substances
    • Slips
    • trips and falls

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Work Around Substandard Structures Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart