Wire Mesh Inclusions Safe Work Method Statement (SWMS)

$96.80

The Wire Mesh Inclusions Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Wire Mesh Inclusions Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Wire Mesh Inclusions Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Wire Mesh Inclusions Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Wire Mesh Inclusions Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Wire Mesh Inclusions Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Wire Mesh Inclusions Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Improper use of safety gear
    • Exposure to hazardous materials
  • 2. Equipment Check
    • Faulty equipment
    • Accidental start-up
  • 3. Trained Personnel Only
    • Misuse of tools
    • Lack of training
  • 4. Handling and Storage
    • Inadequate storage
    • Improper manual handling
  • 5. Cutting Wire Mesh
    • Contact with sharp edges
    • Flying debris
  • 6. Cleaning Work Area
    • Slips
    • trips and falls
    • Contact with harmful substances
  • 7. Attaching Mesh to Frames
    • Improper fixture
    • Overexertion
  • 8. Inspection of Mesh
    • Overlooking defects
    • Ergonomic issues
  • 9. Corrective Measures
    • Insufficient remedial actions
    • Delay in implementation
  • 10.Transportation of Mesh
    • Vehicle related accidents
    • Manual lifting
  • 11.Installation of Mesh
    • Falls from height
    • Tripping over objects
  • 12.Removal of Waste Material
    • Exposure to harmful substances
    • Needlestick or sharps injuries
  • 13.Evaluating Work Performance
    • Unreliable feedback
    • overlooking areas of improvement
  • 14.Reporting and Documentation
    • Late reporting
    • Incomplete information
  • 15.Continuity of Production
    • Workplace disruption
    • Delay in schedule
  • 16.Equipment Maintenance
    • Malfunction during usage
    • Late prevention measures
  • 17.Training and Refreshers
    • Information overload
    • Training deficiencies
  • 18.Final Site Clearance
    • Not properly cleared site
    • Risk of injuries
  • 19.Customer Feedback
    • Incomplete feedback
    • Misinterpretation of feedback
  • 20.Process Monitoring and Updates
    • Improper documentation
    • outdated processes

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Wire Mesh Inclusions Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart