Verifying Age For Certain Sales Safe Work Method Statement (SWMS)

$96.80

The Verifying Age For Certain Sales Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Verifying Age For Certain Sales Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Verifying Age For Certain Sales Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Verifying Age For Certain Sales Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Verifying Age For Certain Sales Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Verifying Age For Certain Sales Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Verifying Age For Certain Sales Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incomplete forms
    • wrong information submitted
  • 2. Visual inspection of ID
    • Misinterpretation due to poor lighting
    • counterfeit IDs
  • 3. Cross-check with records
    • Duplication of records
    • errors in existing records
  • 4. Verify age details
    • Counterfeit Birth Certificates
    • modified Birth date
  • 5. Equipment use (Scanner)
    • Equipment malfunction
    • misuse of equipment
  • 6. System Recording
    • Components failure
    • system crash during recording
  • 7. Document Verification
    • Failure to recognise forgery
    • misplacement of documents
  • 8. Interviewing minor (if needed)
    • False answers
    • Ascertain truthfulness under stress
  • 9. Collection of Sales Receipts
    • Damage receipts
    • lost receipts.
  • 10. Submission and Approval Process
    • Unauthorised approval
    • incorrect submission process
  • 11. Reporting Suspected Fraudulent Cases
    • Misinterpretation
    • fear of repercussion
  • 12. Data Entry of Verification Result
    • Data entry error
    • data omission
  • 13. Customer Communication
    • Wrong communication
    • misinforming customer
  • 14. Safekeeping of Verified Documents
    • Losing documents
    • mishandling of sensitive documents
  • 15. Final Validation Check
    • Missing oversight
    • human error
  • 16. Monitoring and review process of implemented measures
    • Overlooking weak points
    • complacency in monitoring
  • 17. Training of new staff
    • Inadequate training
    • lack of understanding
  • 18. Housekeeping at the end of day
    • Damage or loss of resources
    • misplacement
  • 19. System Update and Maintenance
    • Failure during update process
    • Lost information
  • 20. Periodic Audit
    • Lack of consistency in checks
    • disgruntled workers non-compliance

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Verifying Age For Certain Sales Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart