Vehicle Reversing At Site Safe Work Method Statement (SWMS)

$96.80

The Vehicle Reversing At Site Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Vehicle Reversing At Site Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Vehicle Reversing At Site Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Vehicle Reversing At Site Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Vehicle Reversing At Site Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Vehicle Reversing At Site Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Vehicle Reversing At Site Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Uneven ground
    • Debris on site
  • 2. Vehicle Inspection
    • Faulty reversing lights/beeper
    • Bald tyres
  • 3. Site/Area Assessment
    • Poor visibility
    • Obstructed view
  • 4. Implement Traffic Management Plan
    • Non-compliance to traffic rule
    • Improper setup
  • 5. Reverse Vehicle into Position
    • Pedestrian traffic
    • Proximity to other vehicles/structure
  • 6. Communication Establishment
    • Ineffective communication devices
    • Language barrier
  • 7. Start Reversing the Vehicle
    • Vehicle malfunction
    • Inattention from operator
  • 8. Monitor Surroundings
    • Unnoticed obstacles
    • Moving equipment/vehicles
  • 9. Stop for Any Hazard Identified
    • Delayed reaction
    • Ignoring the hazard
  • 10. Continue Reversing after Clearing Hazards
    • Remaining unseen hazards
  • 11. Signal When Reversing Completed
    • Missed or misunderstood signal
    • Distracted associate
  • 12. Exit Reversing Area Smoothly
    • Speed over control
    • Poor visibility
  • 13. Confirm Clearance with Spotters
    • Lack of coordination
    • Worn-out communication devices
  • 14. Document Completed Task
    • Documentation error
    • Unreported incident/error
  • 15. Post Operation Review
    • Overlooked errors
    • Unaddressed suggestions from team
  • 16. Maintenance Check
    • Forgotten or skipped steps
    • Ignored minor faults
  • 17. Reporting Any Issues
    • Failure to report
    • Miscommunication
  • 18. Carry Out Necessary Repairs
    • Incomplete repair
    • Temporary solution used
  • 19. Evaluate for Continuous Improvement
    • Ignoring feedback
    • Lack of follow-up action
  • 20. Update Risk Management Procedures
    • Late updates
    • Ignored suggestions

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Vehicle Reversing At Site Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart