Vault Opening Safe Work Method Statement (SWMS)

$96.80

The Vault Opening Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Vault Opening Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Vault Opening Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Vault Opening Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Vault Opening Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Vault Opening Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Vault Opening Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect equipment
    • Lack of staff training
    • Inadequate safety gear
  • 2. Vault Inspection
    • Faulty vault door
    • Failure in access control system
  • 3. Pre-Opening Checks
    • Missed security threats
    • Faulty alarm systems
  • 4. Opening Vault Door
    • Inautentic/untrusted personnel
    • Incorrect handling techniques
  • 5. Accessing Vault Contents
    • Misplacement of items
    • Unorganised contents
  • 6. Securing Vault
    • Failure in lock mechanism
    • Delay in securing due to distractions
  • 7. Operating Security Systems
    • System malfunction
    • Unauthorised access attempt
  • 8. Verification and Documentation
    • Lost documents
    • Incorrect entries
  • 9. Handling Cash/Valuables
    • Theft
    • Physical injury due to incorrect handling
  • 10. Clearing Up After Operation
    • Misplacement of tools
    • Leftover trash creating tripping hazards
  • 11. Closing Procedures
    • Faulty locking mechanisms
    • Lost keys
  • 12. Post-Operation Checks
    • Missed security breaches
    • Damaged equipment
  • 13. Staff Dismissal
    • Unverified staff presence
    • Improper sign-out
  • 14. Emergency Response Training
    • Unprepared staff
    • Lack of emergency response knowledge
  • 15. Routine Maintenance Check
    • Faulty equipment
    • Overlooked repairs
  • 16. Regular Vault Auditing
    • Miscounted items
    • Unprocessed files
  • 17. Security System Updates
    • Outdated systems
    • Failed update installations
  • 18. Disposal of Waste Materials
    • Mishandling of waste
    • Incorrect disposal methods
  • 19. Staff Training and Briefings
    • Uninformed staff
    • Lapse in training
  • 20. Final Security Checks and Sign-out
    • Missed security checklists
    • Forged sign-outs

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Vault Opening Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart