Utilising Chop Saws Safe Work Method Statement (SWMS)

$96.80

The Utilising Chop Saws Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Utilising Chop Saws Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Utilising Chop Saws Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Utilising Chop Saws Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Utilising Chop Saws Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Utilising Chop Saws Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Utilising Chop Saws Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate training
    • Poor workplace layout
  • 2. Equipment Check
    • Damaged equipment
    • Faulty electrical connections
  • 3. Blade Selection
    • Incorrect blade choice
    • Manual handling injury
  • 4. Cutting Material Setup
    • Incorrect clamp setup
    • Incorrect material placement
  • 5. Perform Cutting
    • Kickback
    • Exposure to dust and noise
  • 6. Adjustment of Saw
    • Manual handling risk
    • Incorrect adjustment
  • 7. Saw Maintenance
    • Electric shock
    • Injury from moving parts
  • 8. Blade Change
    • Hand injury
    • Eye injury from flying debris
  • 9. Work Area Clean Up
    • Tripping over obstacles
    • Cuts from sharp objects
  • 10. Waste Disposal
    • Manual handling injury
    • Exposure to dust and particles
  • 11. Inspection Before Use
    • Unintended operation
    • Missing safety guard
  • 12. Equipment Storage
    • Improper lifting
    • Lower back injuries
  • 13. Personal Protective Equipment use
    • Insufficient protection
    • Ill-fitting PPE
  • 14. Lubrication & Cleaning
    • Exposure to harmful chemicals
    • Slip and fall hazards
  • 15. Emergency Procedures Training
    • Lack of evacuation knowledge
    • Panic in emergency situation
  • 16. Regular Maintenance Check
    • Worn out parts
    • Unintentional start-up during maintenance
  • 17. Material Measurement & Mark-up
    • Using inappropriate tools
    • Inaccuracy in the measurement
  • 18. Saw testing after repairs
    • Machinery malfunction
    • Cut injuries
  • 19. First Aid Training
    • Inadequate first aid
    • Delayed response to injury
  • 20. Fire Prevention Measures
    • Incomplete fire safety measures
    • Combustible material accumulation

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Utilising Chop Saws Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart