Utilise Hot Stapling Tools Safe Work Method Statement (SWMS)

$96.80

The Utilise Hot Stapling Tools Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Utilise Hot Stapling Tools Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Utilise Hot Stapling Tools Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Utilise Hot Stapling Tools Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Utilise Hot Stapling Tools Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Utilise Hot Stapling Tools Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Utilise Hot Stapling Tools Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect handling
    • Lacerations from sharp staples
  • 2. Setup
    • Electric shock
    • Tripping over power cord
  • 3. Use of Hot Stapling Tools
    • Burns
    • Eye injuries from flying sparks
  • 4. Maintenance
    • Electric shock during cleaning
    • Cuts from sharpening staple knives
  • 5. Storage
    • Tripping over improperly stored tools
    • Staples causing puncture wounds
  • 6. Breakdown
    • Releasing residual energy
    • Injuries due to improper dissembling
  • 7. Transport
    • Manual lifting injuries
    • Slips or falls due to misplaced items
  • 8. Inspection
    • Failure to identify faults
    • Overlooking safety requirements
  • 9. Staple Loading
    • Rapid dismissal of staples
    • Finger caught in staple channel
  • 10. Adjustment
    • Finger pinching
    • Incorrect setting may cause project damage
  • 11. Connection to Power Source
    • Electrocution
    • Overloading of circuits
  • 12. Testing
    • Inadequate performance creating hazards
    • Equipment failure
  • 13. Warmup
    • Burn risks
    • Exposure to excessive heat
  • 14. Operation
    • Noise induced hearing loss
    • Hand-arm vibration syndrome
  • 15. Switch Off
    • Electric shock
    • Burns from hot surfaces
  • 16. Cleaning
    • Exposure to cleaning chemicals
    • Sharp staple injury
  • 17. Waste Disposal
    • Accidental injury from disregarded staples
    • Improper disposal of chemicals
  • 18. Safety Check
    • Failure in identifying risks
    • Non-observance to safety standards
  • 19. Dismantling
    • Injuries due to incorrect handling
    • Electrocution
  • 20. Reporting
    • Mishandling of data
    • Miscommunication of risks

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Utilise Hot Stapling Tools Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart