Using Trowels Safe Work Method Statement (SWMS)

$96.80

The Using Trowels Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Using Trowels Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Using Trowels Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Using Trowels Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Using Trowels Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Using Trowels Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Using Trowels Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slips
    • trips and falls
    • improper lifting techniques
  • 2. Select Tools
    • Incorrect tools for the job
    • trowel sharpness
  • 3. Safety Check
    • Fails to notice damage to trowel
    • unaware of safety procedure
  • 4. Handle Trowel
    • Injury from incorrect grip
    • repetitive strain injury
  • 5. Applying Material
    • Skin irritation from materials
    • eye injuries
  • 6. Spreading Materials
    • Overexertion
    • inappropriate postures
  • 7. Shape Surface
    • Mishandling of trowel
    • dust inhalation
  • 8. Smoothing Surface
    • Repetitive movements causing strain
    • cuts from trowel
  • 9. Final Inspection
    • Fails to identify mistakes
    • slips
    • trips and falls
  • 10. Clean up
    • Heaviness of delivering material
    • skin contact with material
  • 11. Maintenance of Trowels
    • Risks of cuts whilst cleaning
    • equipment malfunction
  • 12. Disposal of Waste
    • Sharp objects
    • hazardous substances
  • 13. Storage of Tools
    • Tripping hazards
    • unsecured equipment falling
  • 14. Review Work
    • Exhaustion leading to lack of attention
    • clumsy handling of tools
  • 15. Incident Reporting
    • Inadequate training or knowledge
    • underestimation of incident severity

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Using Trowels Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart