Use Propane Flaming Equipment Safe Work Method Statement (SWMS)

$96.80

The Use Propane Flaming Equipment Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Use Propane Flaming Equipment Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Use Propane Flaming Equipment Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Use Propane Flaming Equipment Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Use Propane Flaming Equipment Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Use Propane Flaming Equipment Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Use Propane Flaming Equipment Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect equipment configuration
    • lack of personal protective equipment
  • 2. Check Equipment
    • Damaged or malfunctioning equipment
    • incorrect gas pressure
  • 3. Propane Cylinder Handling
    • Manual handling injuries
    • potential for explosion
  • 4. Ignition of Equipment
    • Uncontrolled fire or explosion
    • thermal burns
  • 5. Flame treating
    • Fire hazard
    • inhalation of toxic gases
  • 6. Extinguishing the flame
    • Uncontrolled fire or explosion
    • thermal burns
  • 7. Gas Shut-off and Disconnection
    • Gas leak
    • fire or explosion hazard
  • 8. Maintenance
    • Faulty or improperly maintained equipment
    • gas leaks
    • fire hazards
  • 9. Clean-up
    • Mechanical injury from cleaning tools
    • chemical exposure from cleaning substances
  • 10. Storage
    • Unsafe storage of propane cylinders
    • obstruction in workspace
  • 11. Emergency Procedures Training
    • Inadequate training leading to hazard mishandling
  • 12. Equipment and Job Site Inspection
    • Ignoring possible risks because of insufficient inspection
  • 13. Supply and Demand Checks
    • Propane cylinder mishandling
    • over-pressurized system
  • 14. Examine Ventilation Systems
    • Exposure to harmful fumes if not adequately ventilated
  • 15. Proper disposal of Waste Materials
    • Improper handling leading to injuries
    • contaminants entering environment
  • 16. Cylinder Transportation
    • Cylinder mishandling causing injury or damage
    • potential for crashes
  • 17. Confined Space Checks
    • Mishandling of equipment leading to injury
    • lack of oxygen
  • 18. Safety Audit Review
    • Insufficient safety checks could lead to unacknowledged hazards
  • 19. Equipment Calibration
    • Incorrect calibration leading to equipment malfunction or hazard
  • 20. Safety Briefings
    • Inadequate safety information resulting in mishandling of tasks

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Use Propane Flaming Equipment Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart