Use Of Wood Glues And Adhesives Safe Work Method Statement (SWMS)

$96.80

The Use Of Wood Glues And Adhesives Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Use Of Wood Glues And Adhesives Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Use Of Wood Glues And Adhesives Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Use Of Wood Glues And Adhesives Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Use Of Wood Glues And Adhesives Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Use Of Wood Glues And Adhesives Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Use Of Wood Glues And Adhesives Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect handling/storage of glues
    • Exposure to harmful chemicals
  • 2. Setup Environment
    • Poor ventilation
    • Slip and trip hazards
  • 3. Use of Adhesives
    • Inhalation of fumes
    • Skin contact with adhesives
  • 4. Application Process
    • Incorrect technique resulting in spills
    • Misplacement causing injury
  • 5. Drying and Curing
    • Exposure to high temperature
    • Flammable chemicals
  • 6. Post-application Cleaning
    • Chemical exposure
    • Slip and trip from spillages
  • 7. Disposal of Waste Material
    • Improper disposal leading to environmental harm
    • Unprotected exposure to hazardous waste
  • 8. Maintenance of Equipment
    • Unplanned machine starting
    • Poorly maintained equipment causing injury
  • 9. Dealing with Spillages
    • Chemical burns
    • Inhalation of toxic fumes
  • 10. Emergency Response Procedures
    • Lack of appropriate training
    • Inadequate emergency response equipment
  • 11. Glue & Adhesive Storage
    • Improper storage leading to chemical reaction
    • Access by unauthorised persons
  • 12. Tool Selection and Usage
    • Incorrect tool selection
    • misuse of tools leading to injury or damage
  • 13. Quality Checks
    • Exposure to uncured adhesives
    • Incorrectly processed materials causing injury
  • 14. Restocking of Materials
    • Heavy lifting causing injury
    • Chemical exposure during unloading/loading
  • 15. Shutdown and Cleanup Procedure
    • Improper disposal of remaining adhesives
    • Physical injury during equipment cleanup

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Use Of Wood Glues And Adhesives Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart