Use Of Side By Side Buggy In Agricultural And Commercial Environments Safe Work Method Statement (SWMS)

$96.80

The Use Of Side By Side Buggy In Agricultural And Commercial Environments Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation
  5. Free customisation service. Add your logo and company details

Specifically, the Use Of Side By Side Buggy In Agricultural And Commercial Environments Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

“`html

Introducing our Safe Work Method Statement (SWMS) Template specially designed for the use of Side by Side Buggies in both agricultural and commercial environments. This template aims to help make your work processes smoother, safer, and more efficient. Crafted with attention to detail and practicality, it serves as a vital resource for managing workplace health and safety requirements.

Key Features:

  • Pre-filled and Comprehensive: The template comes pre-loaded with common operational details, risk factors, and safety measures often applicable to side by side buggies, saving you time while also reducing the risk of omissions.
  • Fully editable and customisable in Microsoft Word format: We understand that each project is unique. This is why our SWMS template is fully editable in Microsoft Word, allowing you to easily customise details to suit the specific needs of your project or site.
  • Includes the scope of the project and the project details: It provides sections where you can outline the specific scope, ensuring every member involved understands what’s required and expected, fostering clarity and setting the stage for a well-coordinated approach.
  • Includes checklist of any high-risk machinery on-site: To further support safe practice, there is a dedicated checklist section for cataloguing high-risk machines. This can assist in proactive risk assessment and management on-site.
  • Includes space for recording any staff training: There’s designated space to log all relevant staff training related to the safe operation of side by side buggies, ensuring everybody is qualified and ready to mitigate risks.
  • Includes before and after risk ratings: One of the best parts? You can record risk ratings assessments—both before and after implementing control measures—to keep track of how well potential hazards are managed over time.
  • Includes resources for use of legislative references: Empower your team with knowledge by adding relevant legislative references provided within the template. It helps reinforce compliance with Australian regulations.
  • Includes all PPE required: Details all necessary Personal Protective Equipment (PPE), ensuring everyone knows what’s needed to minimise exposure to workplace hazards.
  • Includes risk assessment and risk assessment matrix: A simplified risk assessment matrix aids in evaluating the severity and likelihood of potential incidents, assisting in forming appropriate safety controls.
  • Includes a checklist to ensure all requirements have been covered when implementing the SWMS: A thorough checklist is included to cross-check everything that should be addressed while implementing your SWMS, helping ensure no stone is left unturned.
  • Includes sign off page for all workers and responsible persons: Promoting accountability and compliance, this includes a sign-off section for workers and managers alike.
  • Easy to use, easy to customise: Designed with simplicity in mind, enabling you to tailor it quickly and efficiently without any hassle. Perfect for busy teams or fast-tracked projects.
  • Suitable for large contracts and Tenders, including tier 1 contractual work: Ideal for a wide range of projects, providing the depth needed for sizable contracts or tender submissions.
  • Quick delivery by email: Upon purchase, receive quick and seamless delivery to your email, allowing swift access anytime, anywhere.

Making sure that the tools of the trade are used wisely and safely shouldn’t be an afterthought. Grab your copy of our SWMS Template today and take one step closer to reaching higher safety standards in your operations.

“`


The Use Of Side By Side Buggy In Agricultural And Commercial Environments Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate training
    • Poor weather conditions
  • 2. Pre-start Check
    • Mechanical faults
    • Fluid leaks
  • 3. Mounting Buggy
    • Slippery surfaces
    • Incorrectly adjusted seats
  • 4. Starting Engine
    • Unfamiliar controls
    • Electrical malfunction
  • 5. Driving on Flat
    • Uneven terrain
    • Wildlife encounters
  • 6. Driving on Slopes
    • Rollovers
    • Loss of traction
  • 7. Loading Cargo
    • Overloading
    • Unsecured loads
  • 8. Unloading Cargo
    • Falling items
    • Strains from lifting
  • 9. Towing Equipment
    • Trailer detachment
    • Overloaded towing
  • 10. Crossing Waterways
    • Drowning hazard
    • Vehicle submersion
  • 11. Night Operation
    • Reduced visibility
    • Incorrect lighting
  • 12. Refuelling
    • Fuel spills
    • Fire hazard
  • 13. Maintenance Checks
    • Exposure to hazardous substances
    • Sharp tools
  • 14. Safety Gear Usage
    • Non-compliance by staff
    • Damaged safety equipment
  • 15. Emergency Protocols
    • Panic during an emergency
    • Inefficient communication
  • 16. Exiting Buggy
    • Slipping while dismounting
    • Contact with moving parts
  • 17. Storage and Parking
    • Poor parking conditions
    • Exposure to weather elements
  • 18. Communication
    • Radio failure
    • Miscommunication
  • 19. Handling Livestock
    • Aggressive animals
    • Distracting movements
  • 20. Documentation
    • Inaccurate record keeping
    • Unauthorized access to safety documents

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Use Of Side By Side Buggy In Agricultural And Commercial Environments Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart