Use First Aid Kit In Injury Response Safe Work Method Statement (SWMS)

$96.80

The Use First Aid Kit In Injury Response Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Use First Aid Kit In Injury Response Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Use First Aid Kit In Injury Response Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Use First Aid Kit In Injury Response Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Use First Aid Kit In Injury Response Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Use First Aid Kit In Injury Response Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Use First Aid Kit In Injury Response Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect use of first aid contents
    • Lack of cleanliness
  • 2. Check First Aid Kit
    • Expired items
    • Missing or inadequate supplies
  • 3. Injury Assessment
    • Misdiagnosis
    • Further harm to victim
  • 4. Decide on Treatment
    • Inappropriate treatment
    • Delay in treatment
  • 5. Apply First Aid
    • Infection from untreated wounds
    • Incorrect application of bandages
  • 6. Monitor Victim
    • Failure to notice worsening symptoms
    • Victim shock or panic
  • 7. Arrange for Further Medical Help
    • Delayed professional medical help
    • Improper moving of the injured person
  • 8. Record Incident in Log Book
    • Missed details or incorrect information recorded
  • 9. Restock First Aid Kit
    • Restocked with expired or inappropriate items
    • Failure to restock
  • 10. Clean up area post-accident
    • Contaminated waste left in area
    • Slips
    • trips and falls
  • 11. Reporting & Review
    • Insufficient details for follow-up
    • Inconsistent accident reporting
  • 12. Training
    • Untrained personnel
    • Lack of knowledge to handle emergency situations
  • 13. Auditing
    • Non-compliance issues
    • Oversight on updating emergency procedures
  • 14. Reviewing SWMS
    • Outdated practices
    • Irrelevant measures due to updated equipment/procedures
  • 15. Implementation of Revised SWMS
    • Unawareness of changes
    • Confusion in handling emergencies
  • 16. Continuous Monitoring & Improvement
    • Failure to identify recurring issues
    • Complacency towards improving work safety measures
  • 17. Compliance with Legislation
    • Non-conformity to local laws and regulations
    • Liability issues
  • 18. Maintenance of First Aid Kit
    • Poor maintenance leading to ineffective tools
    • expired items
  • 19. Periodic Review and Update of Skills
    • Skills attrition
    • Outdated knowledge and techniques
  • 20. Public Awareness and Education
    • Unawareness among the public (in case of roadside accidents etc.)
    • incorrect action taken during emergencies

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Use First Aid Kit In Injury Response Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart