Unloading Raw Materials From A Freight Train. Safe Work Method Statement (SWMS)

$96.80

The Unloading Raw Materials From A Freight Train. Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Unloading Raw Materials From A Freight Train. Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Unloading Raw Materials From A Freight Train. Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Unloading Raw Materials From A Freight Train. Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Unloading Raw Materials From A Freight Train. Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Unloading Raw Materials From A Freight Train. Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Unloading Raw Materials From A Freight Train. Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Pre-arrival preparation
    • Inadequate training
    • Improper personal protective equipment (PPE)
  • 2. Check Train Arrival
    • Slips
    • trips and falls
    • Struck by moving vehicle
    • Noise
  • 3. Setup safety zones
    • Incorrect positioning
    • Inadequate signage
  • 4. Open freight doors
    • Strains and sprains
    • Falling objects
  • 5. Activate unloading plant
    • Uncontrolled energy source
    • Equipment malfunction
  • 6. Position receiving bins
    • Moving heavy items
    • Crush injuries
  • 7. Unload materials
    • Falling objects
    • Caught in/between objects
  • 8. Inspect materials
    • Cut or abrasion injuries
    • Exposure to hazardous substances
  • 9. Record all received materials
    • Manual handling
    • Paper cuts
  • 10. Close freight doors
    • Strains and sprains
    • Pinch points
  • 11. Deactivate unloading plant
    • Uncontrolled energy source
    • Equipment malfunction
  • 12. Remove safety zones
    • Not visible to traffic
    • Pedestrian-vehicle interaction
  • 13. Post-training evaluation
    • Improper procedures followed
    • Inadequate knowledge
  • 14. Report any incidents or near misses
    • Psychological stress
    • Failing to report
  • 15. Clean up work area
    • Slippery surfaces
    • Sharp objects
  • 16. Final inspection of work area
    • Undetected hazards
    • Unsecured equipment
  • 17. Report and document all completed tasks
    • Omitted procedures
    • Lack of proper documentation
  • 18. Prepare train for departure
    • Moving heavy items
    • Crush injuries
  • 19. Train departure
    • Struck by moving vehicle
    • Noise
  • 20. Post-work debriefing
    • Inadequate communication
    • Psychological stress

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Unloading Raw Materials From A Freight Train. Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart