Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Unloading And Loading Of Solar Panels Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Inadequate training
- Absence of PPEs
- 2. Arrival at Site
- Traffic accidents
- Damage to solar panels during transport
- 3. Setup of Unloading Area
- Disorganised work area
- Slipping and tripping hazards
- 4. Pre-unload Safety Checks
- Improper handling of equipment
- Damaged equipment
- 5. Unloading of Solar Panels
- Manual handling injuries
- Dropped object hazards
- 6. Transportation to Location
- Struck by moving vehicle
- Load instability
- 7. Inspecting Panels Before Installment
- Electrical shock
- Cuts from sharp edges
- 8. Installation of Solar Panels
- Falls from height
- Electrical shock
- 9. Post-installation Checks
- Incorrect setup
- Electrical faults
- 10. Packing up Tools and Equipment
- Injury from incorrect manual handling
- Misplacement of tools causing trips
- 11. Loading of Equipment onto Vehicles
- Manual handling injuries
- Dropped object hazards
- 12. Leaving the Site
- Road traffic accidents
- Damage caused by unsecured load
- 13. Workshop Return and Equipment Check
- Loss of or damaged equipment
- Risk of injury from faulty equipment
- 14. Reporting and Documentation
- Incomplete documentation
- Miscommunication of safety procedures
- 15. Periodic Maintenance and Checkup
- Exposure to electrical shock
- Falls from heights while servicing