Underbody Steam Cleaning Safe Work Method Statement (SWMS)

$96.80

The Underbody Steam Cleaning Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Underbody Steam Cleaning Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Underbody Steam Cleaning Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Underbody Steam Cleaning Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Underbody Steam Cleaning Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Underbody Steam Cleaning Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Underbody Steam Cleaning Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Slippery floors
    • Exposure to chemicals
  • 2. Load Equipment
    • Heavy lifting
    • Struck by moving object
  • 3. Preliminary Cleaning
    • Skin contact with harmful substances
    • Eye damage from debris
  • 4. Operating Steam Cleaner
    • Noise exposure
    • Hot surface contact burns
  • 5. Rinse Underbody
    • Water spray
    • Falling objects
  • 6. Post Cleaning Inspection
    • Sharp objects
    • Exposure to cleaning agents
  • 7. Unload and store equipment
    • Incorrect handling or storing
    • Tripping over equipment
  • 8. Waste Disposal
    • Exposure to hazardous waste
    • Cut injuries from sharp waste
  • 9. Sanitising work area
    • Chemical exposure
    • Slips and trips
  • 10. Debrief and Reporting
    • Miscommunications
    • Negligence
  • 11. Sign Off Procedure
    • Incorrect documentation
    • Errors in communication
  • 12. Regular Maintenance
    • Contact with electricity
    • Potential for falling equipment
  • 13.Training of Staff
    • Incorrect use of equipment
    • Exposure to chemicals
  • 14. Emergency Preparedness
    • Panic during emergency
    • Inadequate training
  • 15. Routine Gear Check
    • Worn out equipment causing accidents
    • Incorrect storage

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Underbody Steam Cleaning Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart