Ultralow Temperature Refrigeration Safe Work Method Statement (SWMS)

$96.80

The Ultralow Temperature Refrigeration Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Ultralow Temperature Refrigeration Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Ultralow Temperature Refrigeration Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Ultralow Temperature Refrigeration Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Ultralow Temperature Refrigeration Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Ultralow Temperature Refrigeration Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Ultralow Temperature Refrigeration Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect use of equipment
    • Poor maintenance
  • 2. Equipment Check
    • Poor maintenance
    • Defective equipment
  • 3. System Startup
    • Electrical faults
    • Gas leaks
  • 4. Temperature Monitoring
    • Exposure to extreme cold
    • Electrical faults
  • 5. Maintenance Work
    • Exposure to refrigerants
    • Inadequate training
  • 6. Refrigerant Leak Avoidance
    • Permeability
    • Improper handling
  • 7. System Shutdown
    • Gas leaks
    • Electrical faults
  • 8. Cleanup and Disposal
    • Chemical exposure
    • Sharp objects
  • 9. Emergency Procedures
    • Lack of awareness
    • Ineffective procedure enforcement
  • 10. Regular Inspection
    • Insufficient ventilation
    • Gas leaks
    • Faulty detection system
  • 11. Documentation and Record Keeping
    • Lost documents
    • Miscommunication
  • 12. Personal Protective Equipment Use
    • Inadequate protection
    • Skin exposure
  • 13. Training and Supervision
    • Lack of skills
    • Inadequate training
  • 14. Safe Manual Handling
    • Incorrect lifting techniques
    • Overexertion
  • 15. Equipment and Machinery Operation
    • Unauthorised operation
    • Machinery malfunction
  • 16. Warehouse Inventory Management
    • Improper storage
    • Stock mishandling
  • 17. Hazard Communication
    • Misinterpretation
    • Lack of information
  • 18. Hazardous Substances Storage
    • Incorrect storage
    • Chemical leakage
  • 19. Routine Equipment Testing
    • Lack of regular checks
    • Defective equipment
  • 20. Purchase and Installation
    • Incorrect installation
    • Unauthorised handling

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Ultralow Temperature Refrigeration Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart