Turf Cutter Safe Work Method Statement (SWMS)

$96.80

The Turf Cutter Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Turf Cutter Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

Introducing the Safe Work Method Statement Template for Turf Cutter, meticulously crafted to meet the stringent demands of Australia’s workplace health and safety requirements. This is more than just a document; it is your go-to partner in maintaining compliance, managing risks, and ensuring the safety of all site workers.

  • Pre-filled and Comprehensive: Throw away the notion of ‘starting from scratch’. Our template comes pre-filled with all relevant sections filled out, delivering a comprehensive platform for your SWMS needs while saving your valuable time.
  • Fully Editable and Customisable: Crafted in Microsoft Word format, this SWMS template allows maximised flexibility during the editing process. Tailor every detail according to your project specificities easily.
  • Includes Project Scope and Details: Document every important bit regarding your project, including its precise scope and any specific details that should be common knowledge on-site, thus facilitating clearer communication.
  • High Risk Machinery Checklists: Vital for those high stakes jobs, where each piece of heavy machinery brings its own unique risk profile. A simple checklist can help manage those risks effectively.
  • Staff Training Records: Space is provided to record detailed information about staff training, ensuring that everyone on the team understands their responsibilities when working with a turf cutter.
  • Included Risk Ratings: We provide before and after risk ratings to help you visualize the impact of implemented controls and show how risks are reduced.
  • Legislative References at Your Fingertips: Using this SWMS template also ensures you get resources for legislative references, an essential feature for strict protocol adherence.
  • All Required PPE Listed: Never overlook a crucial safety gear again! Our template includes all recommended PPE required when handling the turf cutter.
  • Comprehensive Risk Assessment:Providing a matrix for recording and assessing any risks related to your project, this makes risk management on site easy and thorough.
  • Ensure All Requirements Are Covered: An integrated checklist is designed to ensure that each requirement of your SWMS has been considered and met for effective implementation.
  • Sign off Page Included: Give everyone, from workers to responsible persons, a chance to acknowledge their understanding and acceptance of the safety processes laid out within.
  • Easy to Use and Personalise: With an intuitive layout and clear instructions, make this document fit your needs with ease, which means less time figuring out how to use it and more time applying it.
  • Suitable for Large Contracts and Tenders: Regardless of how big the job, even if it’s tier 1 contractual work, our template will scale alongside your operations without hassle.
  • Quick Delivery by Email: Receive your Safe Work Method Statement Template swiftly via email after purchasing to get things rolling straight away.

In the world of workplace health and safety, every small effort matters and our Safe Work Method Statement Template for Turf Cutter is designed to reshape these efforts into effective safety actions with maximum benefits. Please remember, nothing can replace a proactive and meticulous approach towards safety, but the right tools can guide you there better.


The Turf Cutter Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Accidental falls
    • Inadequate training
  • 2. Unloading Equipment
    • Back injury
    • Damage to equipment
  • 3. Inspection and Maintenance
    • Electrical hazards
    • Improper handling
  • 4. Start-Up Procedure
    • Sudden machine start
    • Loose clothing caught in machine
  • 5. Cutting Turf
    • Sharp tool injuries
    • Extreme temperature exposure
  • 6. Loading Cut Turf
    • Heavy lifting
    • Slips and trips
  • 7. Transporting Turf
    • Traffic accidents
    • Overweight loads
  • 8. Unloading Turf at Site
    • Falling objects
    • Incorrect equipment use
  • 9. Laying Turf
    • Repetitive motion injuries
    • Dehydration
  • 10. Clearing Site
    • Incorrect disposing of waste
    • Hazardous material exposure
  • 11. Machine Shutdown
    • Sudden machine stop
    • Heat from machine parts
  • 12. Clean-Up Procedure
    • Slippery surfaces from cleaning
    • Exposure to chemicals
  • 13. Equipment Storage
    • Misplaced items causing trip hazards
    • Equipment theft
  • 14. Reporting any Incidents/Injuries
    • Lack of communication
    • Lost documentation
  • 15. Review and Improvement
    • Lack of regular review
    • Resistance to change

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Turf Cutter Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Your document will be delivered in editable Microsoft Word format. This PDF sample is just for preview

Frequent Questions

Safe Work Method Statement Template FAQ’s

What format is a BlueSafe Australia Safe Work Method Statement Template delivered in?

Because every SWMS needs to be edited to suit on-site specifics, it makes sense to deliver our Safe Work Method Statements in Microsoft Word Format for easy editing.

How many pages long is each Safe Work Method Statement Template?

It depends entirely on the nature of the risks associated with the SWMS Template, however on average the documents are between 7-15 pages in length. Each Safe Work Method Statement is comprehensive in nature and is easy to use.

What are before and after risk ratings?

Before and after risk ratings are simply this: When you initially start to do a job, like say drill a hole in a wall, there will be a level of risk, which for this example let's just say is a level 2 (before). The idea is that then you would implement some type of control measure to reduce the risk, and in this case we would implement the control measure of wearing safety glasses to protect the eyes. This now would bring the risk of an injury down to a level 1 (after). Here you can see how the SWMS has a before and after risk rating for each step of a job, task or process.

Why do the Safe Work Method Statement Templates have before and after risk ratings?

Before and after risk ratings are a simple and effective way to clearly show how, and how much a certain level of risk has been brought down for a certain step in a job task or process. Another reason also is that many larger contractors now like to see before and after risk ratings, so it makes sense to include them in our Templates.

Are the SWMS Templates pre-filled?

Absolutely. Every Safe Work Method Statement Template is pre-filled, high quality and comprehensive in order to help save you as much time, and deliver as much quality information as possible when conducting your own on site safety.

Do the Safe Work Method Statement Templates come with a Risk Assessment?

Yes. Each Safe Work Method Statement comes with it's own built in Risk Assessment which is part of the working document. The SWMS is straightforward, easy to use and has a risk calculator to work out the risk level and likelihood of the risk occurring.

Does each SWMS Template have the required PPE already suggested?

Yes, each SWMS Template has a range of PPE recorded, as well as picture icons of different PPE items that you can add/remove as you need to for the requirements of the job task.

What Should be Included in a Safe Work Method Statement?

If you're going to be doing any high risk construction work, you'll most likely not only need a Safe Work Method Statement, but you'll also need to make sure your SWMS has a number of checks and balances in order for the document to be accepted in your construction site safety. Purchasing a safe work method statement template can help save you quite a lot of time rather than starting from scratch. Also, just remember that even though every BlueSafe Template is highly comprehensive and pre-filled, your SWMS Template should be adjusted to suit any noticeable risks that are specific to the task you are performing.

Your Safe Work Method Statement must:
  • List or show the different types of construction work that is high risk
  • Clearly explain the workplace health and safety hazards as well as the risks that arise from the works
  • Explain in detail how each risk will be managed, maintained and controlled
  • Explain how each control measure will be implemented in order to reduce each risk
  • Describe how each control measure will be monitored an how often the control measures will be reviewed
  • Consider any additional factors that may impact the level of risk involved with the safety of the construction site such as weather, wind etc.
  • Be made available and accessible to read by employees and applicable personnel at any time.
  • Every SWMS should be easy to understand and written in plain language
  • Every BlueSafe Australia Safe Work Method Statement Template is straightforward and easy to use. They also have what's called 'before and after risk ratings', which basically means there's a built in risk assessment that is used in the process of using the document. This allows you to asses the initial risks and give them a score, and then assess the risk and give an 'after score' once the listed control measures are implemented. All our documents are comprehensive, pre-filled and easy to use. You can even download a sample below and see an example.
Shopping Cart