Transporting Tools And Materials Up Ladders Safe Work Method Statement (SWMS)

$96.80

The Transporting Tools And Materials Up Ladders Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Transporting Tools And Materials Up Ladders Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Transporting Tools And Materials Up Ladders Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Transporting Tools And Materials Up Ladders Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Transporting Tools And Materials Up Ladders Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Transporting Tools And Materials Up Ladders Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Transporting Tools And Materials Up Ladders Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over materials
    • Manual handling injuries
  • 2. Ladder Selection
    • Incorrect ladder used
    • Defective ladder equipment
  • 3. Inspecting Ladder
    • Falls from height
    • Slipping on ladder rungs
  • 4. Setting Up Ladder
    • Instability while placing ladder
    • Struck by falling materials/tools
  • 5. Carrying Tools/Materials to Ladder
    • Manual handling injuries
    • Struck by falling objects
  • 6. Climbing Ladder with Tools/Materials
    • Fall due to overweight or imbalance
    • Dropping tools/materials
  • 7. Ascending/Descending Ladder
    • Falling from height
    • Losing grip/balance
  • 8. Working at Height
    • Falling objects
    • Falling from height
  • 9. Dismounting Ladder
    • Falls while descending
    • Struck by falling ladder
  • 10. Tool/Material Retrieval
    • Tripping over materials
    • Manual handling injuries
  • 11. Storing Tools/Materials
    • Poor storage leading to trip hazards
    • Manual handling injuries
  • 12. Dismantling Ladder
    • Manual handling injuries
    • Struck by falling ladder
  • 13. Transporting Ladder
    • Impact injuries during transport
    • Manual handling injuries
  • 14. Inspection and Maintenance
    • Faulty equipment not detected
    • Injuries during inspection/maintenance
  • 15. Emergency Procedures
    • Lack of knowledge leading to increased injury
    • Delays in response time

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Transporting Tools And Materials Up Ladders Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart