Transport Hazardous Cleaning Agents Safe Work Method Statement (SWMS)

$96.80

The Transport Hazardous Cleaning Agents Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Transport Hazardous Cleaning Agents Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Transport Hazardous Cleaning Agents Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Transport Hazardous Cleaning Agents Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Transport Hazardous Cleaning Agents Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Transport Hazardous Cleaning Agents Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Transport Hazardous Cleaning Agents Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Impure containers
    • Incorrect handling and storage of cleaning agents
  • 2. Loading
    • Inadequate load restraints
    • Packing incompatible agents together
  • 3. Taking Inventory
    • Miscounting inventory leading to overstock or shortage
    • Accidental exposure to hazardous agents
  • 4. Transport
    • Road injury due to unsafe driving
    • Spillage of hazardous agents when transporting
  • 5. Offloading
    • Exposure to hazardous substances during offloading
    • Strain from improper lifting techniques
  • 6. Storage
    • Improper labelling leading to misuse
    • Leaking containers
  • 7. Use
    • Direct contact with skin causing irritation
    • Inhalation of fumes
  • 8. Return
    • Improperly cleaned equipment causing contamination
    • Mishandling leading to damage
  • 9. Disposal
    • Incorrect disposal causing environment pollution
    • Exposure to harmful substances
  • 10. Emergency Handling
    • Absence of emergency measures
    • Lack of training leading to panic and worsening of situations
  • 11. Recordkeeping
    • Poor records management leading to safety breaches
    • Lost documents
  • 12. Periodic audit
    • Overlooked hazards
    • Compliance failures
  • 13. Review of controls
    • Implementation failure
    • Inefficient control methods
  • 14. Staff training
    • Poor understanding of work steps
    • Incorrect use of PPE
  • 15. Feedback system
    • Mishandling of identified issues
    • Non-reporting of hazards by employees

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Transport Hazardous Cleaning Agents Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart