Training And Supervising Apprentices Safe Work Method Statement (SWMS)

$96.80

The Training And Supervising Apprentices Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Training And Supervising Apprentices Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Training And Supervising Apprentices Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Training And Supervising Apprentices Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Training And Supervising Apprentices Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Training And Supervising Apprentices Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Training And Supervising Apprentices Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Lack of protective equipment
    • improper tool handling
  • 2. Training
    • Inadequate training
    • training under adverse conditions
  • 3. Supervision
    • Lack of clear instructions
    • inadequate supervision
  • 4. Use of Equipment
    • Faulty equipment
    • misuse of machines
  • 5. Material Handling
    • Improper storage
    • heavy loads
  • 6. Workshop Safety
    • Poor housekeeping
    • fire risk
  • 7. Chemical Usage
    • Chemical exposure
    • improper disposing of chemicals
  • 8. Ergonomics
    • Incorrect posture
    • insufficient breaks
  • 9. Personal Protective Equipment (PPE)
    • Improper use
    • not wearing PPE
  • 10. Electrical Safety
    • Presence of water
    • faulty wires
  • 11. Noise Control
    • Excessive noise
    • lack of ear protection
  • 12. Waste Management
    • Hazardous waste
    • incorrect disposal
  • 13. Vehicle Safety
    • Unchecked vehicles
    • unsafe loading
  • 14. Emergency Procedures
    • Lack of knowledge about procedures
    • panic during emergency
  • 15. Completion & Review
    • Overlooking safety inspections
    • disregarding feedback

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Training And Supervising Apprentices Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart