Traffic Guiding In Yards Safe Work Method Statement (SWMS)

$96.80

The Traffic Guiding In Yards Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Traffic Guiding In Yards Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Traffic Guiding In Yards Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Traffic Guiding In Yards Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Traffic Guiding In Yards Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Traffic Guiding In Yards Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Traffic Guiding In Yards Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Falling objects
    • slips
    • trips and falls
  • 2. Inspect Site
    • Vehicle collision
    • exposure to harmful substances
  • 3. Equipment Check
    • Defective equipment causing injury
  • 4. Road Blocks Set up
    • Moving vehicles
    • improper barricading
  • 5. Traffic Control Signs Placing
    • Incorrect sign placement leading to confusion
  • 6. Pedestrian Pathway Clearing
    • Trip hazards
    • moving vehicles
  • 7. Guiding Vehicles
    • Moving vehicles
    • poor visibility conditions
  • 8. Emergency Procedures Briefing
    • Lack of knowledge posing risk in emergencies
  • 9. Break Time Management
    • Fatigue related errors
  • 10. Replenishing Supplies
    • Improper storage
    • manual handling injuries
  • 11. Vehicle Movement Monitoring
    • Collisions
    • reversing vehicles
  • 12. Poor Weather Management
    • Slips
    • falls due to wet surface
    • poor visibility
  • 13. Night Shift Management
    • Poor visibility
    • tiredness errors
  • 14. Crowd Control
    • Inadequate crowd management leading to injuries
  • 15. Clean Up
    • Slip
    • trip hazards
    • incorrect disposal of waste

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Traffic Guiding In Yards Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart