Introducing our Safe Work Method Statement Template for Tower Crane – a one-stop, comprehensive template that is absolutely chockers with all the essentials you’ll need. Developed with tradespeople like yourself in mind, it eliminates the faff of paperwork, ensuring your work site is safer and compliant.
Pre-filled and Comprehensive: This isn’t some bare-bones operation! This template comes pre-filled with all the necessary sections needed to document your work details on site. You’ll find it’s comprehensive yet straightforward, without any unnecessary fluff.
Fully editable and customisable in Microsoft Word format: Not everyone works the same way – we get it. That’s why this template is fully editable and customisable in MS Word, so it bends to fit your needs, not the other way ’round.
Includes the scope of the project and the project details: Avoid any confusion by clearly recording the specifics of each job with included sections for project scope and details. It should as clear as a bell.
Includes a checklist of any high-risk machinery on site: Stay ahead of potential risks with the included machinery checklist. It prompts you to identify any potentially troublesome tech on site.
Includes space for recording staff training: Keeping track of who’s trained in what is critical, right? That’s where the dedicated space for recording staff training comes into play. So, nobody’s safety gets left behind in the toolbox.
Includes before and after risk ratings: Spot the difference with before and after risk ratings. They provide a clear visual of how safety measures have reduced danger. Safety first, 100%!
Includes resources for use of legislative references: Don’t worry about the legislative stuff, mate! The template has integrated resources to help you navigate necessary references.
Includes all PPE required: Our template includes a detailed list of all Personal Protective Equipment (PPE) required. No more heading into jobs unprepared.
Includes risk assessment and risk assessment matrix: With an in-depth risk assessment and easy-to-follow matrix, you can zero in on potential hazards and manage them effectively.
Includes a checklist to ensure all requirements have been covered: Not missing a beat, it also features a checklist for ticking off every single requirement when using Safe Work Method Statements (SWMS). Now that’s thorough!
Includes sign-off page for all workers and responsible persons: This handy inclusion ensures accountability from all parties, so everyone’s on the same page – literally.
Easy to use, easy to customise : By keeping things simple and straightforward, we’ve ensured this template is as easy to use as a vegemite sandwich.
Suitable for large contracts and Tenders, including tier 1 contractual work: Newbie or old hand, this template scales up to even the largest contracts and tenders so it’s got your back, no matter the size of the job.
Quick delivery by email: Why wait? After purchasing, we’ll send you the template straight away via email. Speedy, efficient and convenient.
The Tower Crane Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Improper setup
- lack of personal protective equipment (PPE)
- 2. Inspection
- Malfunctioning equipment
- electrocution
- 3. Loading
- Unsecured load
- overload
- 4. Lifting
- Falling loads
- swing-back
- 5. Transferring Load
- Collision
- destabilisation
- 6. Offloading
- Dropping loads
- injury from manual handling
- 7. Dismantling
- Falling parts
- instability
- 8. Maintenance
- Inadequate maintenance
- fire hazard
- 9. Emergency Procedures
- Lack of training
- slow response time
- 10. Clean-up
- Tripping hazards
- falling from height
- 11. Storage
- Incorrect storage
- theft
- 12. Security
- Unauthorized access
- sabotage
- 13. Documentation
- Poor record keeping
- non-compliance
- 14. Communication
- Lack of clear communication
- misunderstanding of instructions
- 15. Training
- Insufficient training
- unfamiliar with operating procedures
- 16. Weather conditions
- Slips and falls
- wind hazards
- 17. Works Overhead
- Injury from falling objects
- electric hazards
- 18. Site Control
- Unsafe site conditions
- non-compliance to safety standards
- 19. Disposal
- Improper disposal
- harm to environment
- 20. Third Party Activities
- Interference with operations
- safety violations
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Tower Crane Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.