Tile Cutting Processes Safe Work Method Statement (SWMS)

$96.80

The Tile Cutting Processes Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Tile Cutting Processes Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Tile Cutting Processes Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Tile Cutting Processes Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Tile Cutting Processes Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Tile Cutting Processes Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Tile Cutting Processes Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Improper workspace setup
    • exposure to electrical hazards
  • 2. Equipment Check
    • Faulty tools
    • incorrect handling of blades
  • 3. Cutting Process
    • Exposure to dust particles
    • risk of cuts from sharp edges
  • 4. Material Handling
    • Handling heavy tile materials
    • incorrect lifting technique
  • 5. Tile Installation
    • Slippery surfaces due to adhesive use
    • sharp tile corners/cuts
  • 6. Grouting Process
    • Misuse of tools
    • chemical exposure (grout compound)
  • 7. Clean Up Duties
    • Wet surfaces causing slips/falls
    • exposure to sharp leftovers
  • 8. Waste Disposal
    • Improper disposal of broken tiles
    • sharp edges causing injury
  • 9. Chemical Handling
    • Incorrect use of cleaning solutions
    • harmful fumes
  • 10. Final Inspection
    • Falling due to loose tile
    • minor wounds from sharp edges
  • 11. Maintenance Activities
    • Use of improper equipment
    • lack of safety gear
  • 12. Emergency Procedures
    • Lack of knowledge for emergencies
    • panic-induced injuries
  • 13. Public Ensuring Safety
    • Public exposure to construction hazards
    • lack of caution signage
  • 14. Dust Control Measures
    • Inhalation of dust
    • direct skin contact
  • 15. Post-task Analysis
    • Misjudgment of task completion
    • overexertion

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Tile Cutting Processes Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart