Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Testing For Presence Of Electricity Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Incorrect setup
- inadequate training
- 2. Equipment Inspection
- Faulty equipment
- improper use
- 3. Testing Setup
- Contact with electricity
- incorrect method
- 4. Using Test Equipment
- Electric shock
- equipment failure
- 5. Identify Test Points
- Unidentified test points
- misreading
- 6. Connect Test Equipment
- Shock
- wrong connection
- 7. Read and Record Results
- Incorrect reading
- record error
- 8. Interpretation of Results
- Misinterpretation
- wrong judgement
- 9. Disconnect Test Equipment
- Electric shock
- wrong procedure
- 10. Secure Work Area
- Unattended tools
- potential hazards left in work area
- 11. Document and Report
- Inaccurate report
- incomplete documentation
- 12. Evaluation
- Wrong analysis
- skipped steps
- 13. Final Checks
- Remaining electrical hazards
- unsecured tools
- 14. Equipment Maintenance
- Poor maintenance practices
- ignored faults
- 15. Feedback and Learning
- Ignored feedback
- lack of continued learning
- 16. Debriefing
- Poor communication
- missed information
- 17. Cleanup
- Incorrect disposal
- left out equipment
- 18. Safety Check on Following Day
- Missed hazards
- unchecked equipment
- 19. Review & Update SWMS
- Outdated methods
- not incorporating changes
- 20. Close Out
- Incomplete process
- skipped steps