Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Testing Electrical Fences Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Trip and falls
- Electrical risks
- 2. Secure Area
- Electrocution
- Falls from height
- Tripping hazards
- 3. Safety Equipment Check
- Faulty equipment
- Ignition of flammable materials
- 4. Hazardous Materials Handling
- Exposure to harmful substances
- Spills and leaks
- 5. Initial Setup
- Unauthorized access
- Struck by moving objects
- 6. Wiring Installation
- Electrical shocks
- Falls from height
- Cuts and abrasions
- 7. Panel Assembly
- Struck by falling objects
- Crushing injuries
- Electrical shocks
- 8. Performance Test
- Fire risks
- Overheating of components
- 9. Final Inspection
- Electrocution
- Explosion dangers
- 10. Power Connection
- Electrical shocks
- Fire incidents due to short circuiting
- 11. Monitoring
- Heavy machinery operation accidents
- Ear injury due to noise
- 12. Maintenance and Troubleshooting
- Electric shock
- Accidental machine start-up
- 13. Emergency Shutdown
- Fire hazards
- Exposure to toxic gases
- 14. Clean-up
- Slips
- trips and falls
- Incorrect disposal of waste
- 15. Review and Reporting
- Miscommunication or misreporting
- Noncompliance to procedures