Test Engine Systems Safe Work Method Statement (SWMS)

$96.80

The Test Engine Systems Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Test Engine Systems Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Test Engine Systems Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Test Engine Systems Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Test Engine Systems Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Test Engine Systems Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Test Engine Systems Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Exposure to harmful substances
    • Tripping over cables.
  • 2. Pre-Operation Checks
    • Electrical shock
    • Equipment failure.
  • 3. Startup of Test Engine System
    • Engine explosion
    • Noise damage.
  • 4. Operation Monitoring
    • Fire Hazard
    • Misinterpretation of data.
  • 5. Routine Maintenance
    • Handling heavy equipment
    • Exposure to chemicals.
  • 6. Emergency Shutdown
    • Inadequate training
    • Panic induced errors.
  • 7. Regular Reporting
    • Paper cuts
    • Poor posture for prolonged time.
  • 8. Fault Diagnosis
    • Electric Shock
    • Burns from hot surfaces.
  • 9. Repair Work
    • Machinery trap injuries
    • Falling from height.
  • 10. Replacement of Parts
    • Incorrect installation
    • Manual handling.
  • 11. Calibration of Instruments
    • Misreading instrument indicators
    • Electrical shock.
  • 12. Validation of Test Results
    • False positives/negatives
    • Data misinterpretation.
  • 13. Shutdown Procedure
    • Uncontrolled release of pressure
    • Burns due to steam.
  • 14. Housekeeping & Clean-up
    • Back strains from lifting
    • Slippery floor.
  • 15. Post-operation Review
    • Stress
    • Fatigue from long working hours.
  • 16. Documentation
    • Poor posture
    • Carpal tunnel syndrome from repetitive work.
  • 17. Quality Control Checks
    • Miscalculations
    • Incorrect interpretation of results.
  • 18. Storage of Equipment
    • Inadequate lighting
    • Manual lifting of heavy equipment.
  • 19. Disposal of Waste Materials
    • Chemical spills
    • Inhaling harmful vapours.
  • 20. Training New Staff
    • Inadequate training
    • Inefficient communication.

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Test Engine Systems Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart