Introducing our Safe Work Method Statement (SWMS) Template specifically designed for Temporary Fencing Setup. Whether you’re a seasoned project manager or a tradesperson on the front lines, this template offers a straightforward and detailed approach to ensure safety compliance and efficient workflows on your site. Here’s what you can expect:
Pre-filled and Comprehensive
- This SWMS template comes pre-filled with industry-standard procedures and details. It is crafted based on common practices in temporary fencing setup, aiming to save you time and effort.
Fully editable and customisable in Microsoft Word format for easy editing
- Feel free to make changes as needed. The template is provided in a Microsoft Word format, ensuring you can adjust it to fit your specific worksite conditions and company policies without fuss.
Includes the scope of the project and the project details
- A well-defined scope section helps you clarify the project’s objectives, boundaries, and any specific considerations, making it easier to align your team’s efforts towards common goals.
Includes checklist of any high risk machinery on site
- Keep track of all high-risk equipment that may be present at the job site, ensuring that risks are identified early and managed effectively.
Includes space for recording any staff training
- Allocate resources to your team based on their qualifications and record any mandatory training sessions right within the document, fostering a culture of continuous improvement and compliance.
Includes before and after risk ratings
- Assess potential risks both before and after implementing control measures, providing a clear view of how safety interventions impact overall site safety.
Includes resources for use of legislative references
- Stay up-to-date with relevant laws and regulations using built-in legislative reference links, helping you maintain compliance easily without having to search elsewhere.
Includes all PPE required
- Detailed PPE requirements are outlined to guarantee all workers have the correct gear to manage the setup safely, crucial for protecting workers from various site hazards.
Includes risk assessment and risk assessment matrix
- An integrated risk assessment tool guides you through identifying potential safety issues and evaluating them systematically, offering a structured approach towards minimising workplace hazards.
Includes a checklist to ensure all requirements have been covered when implementing the SWMS
- A comprehensive checklist assists in verifying that nothing falls through the cracks during safety planning, keeping your operations safe and compliant.
Includes sign off page for all workers and responsible persons
- By signing off, workers and supervisors acknowledge understanding the SWMS content, fostering accountability and reinforcing the importance of adhering to safe work practices.
Easy to use, easy to customise
- With its user-friendly design, even those less familiar with documentation processes can find their way around the template effortlessly, ensuring accessible safety management for all.
Suitable for large contracts and Tenders, including tier 1 contractual work
- The robust framework makes it ideal for handling significant projects, aligning with contractor requirements whether for tenders or ongoing partnerships.
Quick delivery by email
- Once ordered, this template will land in your inbox swiftly, allowing you to get started on enhancing your site’s safety measures straight away.
We designed this template with an understanding of everyday challenges faced on construction sites. While it covers important points and fosters a safety-first mindset, it’s adaptable to fit your unique needs on-the-ground. Remember, while thorough preparation goes a long way in enhancing site safety, it’s ultimately about continuous improvements and vigilance in all operations.
“`
The Temporary Fencing Setup Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:
- 1. Preparation
- Uneven ground
- weather conditions
- 2. Material Handling
- Lifting injuries
- falling materials
- 3. Site Inspection
- Trip hazards
- sharp objects
- 4. Delivering Fencing Materials
- Traffic
- heavy lifting
- 5. Establish Work Area
- Public access
- moving vehicles
- 6. Unloading Components
- Crushing injury
- equipment malfunction
- 7. Erecting Posts
- Manual handling
- unstable posts
- 8. Install Horizontal Panels
- Finger injury
- panel collapse
- 9. Fastening Panels
- Pinching hazards
- tool misuse
- 10. Secure to Ground
- Tripping on tools
- improper installation
- 11. Check Stability
- Fence collapse
- structural weakness
- 12. Inspect for Gaps
- Unauthorized entry
- wildlife intrusion
- 13. Adjust Sections
- Tool usage injuries
- sections falling
- 14. Final Safety Check
- Missed hazards
- overlooked gap
- 15. Signage Placement
- Signage falling
- public safety information missed
- 16. Dismantling Fencing
- Collapse during removal
- material damage
- 17. Load Out
- Traffic during load-out
- slipping during loading
- 18. Post-Work Site Cleanup
- Debris hazards
- environmental concerns
- 19. Documentation Completion
- Overlooking critical details
- misrecording data
- 20. Toolbox Talk Review
- Misunderstanding of safety procedures
- incomplete addressal of issues
Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.
The Temporary Fencing Setup Safe Work Method Statement (SWMS) references:
Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.