Supplying Door Closers Safe Work Method Statement (SWMS)

$96.80

The Supplying Door Closers Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Supplying Door Closers Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Supplying Door Closers Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Supplying Door Closers Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Supplying Door Closers Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Supplying Door Closers Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Supplying Door Closers Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Accident from improper handling of materials
    • Injuries from incorrect manual lifting technique
  • 2. Door Closer Inspection
    • Finger entrapment
    • exposure to harmful substance
  • 3. Old Door Closers Removal
    • Falling objects
    • sharp edges causing cuts
  • 4. Rigging and Installation
    • Accidental dropping of door closer
    • Drilling related accidents
  • 5. Testing of New Installed Door Closers
    • Using machinery without knowledge or training
    • Mishandling of equipment
  • 6. Waste Material Management
    • Tripping over waste
    • puncture or cut injuries from waste disposal
  • 7. Checking Installation
    • Use of incorrect tools
    • finger trapping in moving parts
  • 8. Cleaning Up the Work Area
    • Slipping and falling
    • Dust inhalation
  • 9. Reporting and Documentation
    • Strain injury from repetitive tasks
    • insufficient work breaks
  • 10. Equipment Demobilization
    • Incorrect lifting technique
  • 11. Risk and Safety Review
    • Faulty equipment usage
    • fatigue due to long hours
  • 12. Emergency Procedures Training
    • Lack of awareness
    • panic responses in crises
  • 13. Maintenance of Door Closer
    • Handling heavy equipment
    • electrical shock
  • 14. Regular Safety Inspections
    • Using defective tools
    • inadequate understanding of hazard recognition
  • 15. Hazard Communication and Training
    • Misunderstanding of hazard or task
    • noncompliance with safety standards
  • 16. Job Debriefing
    • Physical fatigue
    • mental stress from work pressure
  • 17. Feedback and Continuous Improvement
    • Limited employee participation
    • insufficient feedback channels
  • 18. Non-Compliance Investigation
    • Failure to report unsafe conditions
    • disregard for safe operating procedures
  • 19. Accident Reporting and Investigation
    • Inaccurate reporting
    • delayed reporting
  • 20. Updating Safety Procedures
    • Outdated information
    • inefficacy of existing controls

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Supplying Door Closers Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart