Structural Work For Door Installing Risk Assessment

$79.50

The Structural Work For Door Installing Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Structural Work For Door Installing Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Structural Work For Door Installing Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Tripping over materials
    • Exposure to dust and particles
  • 2. Removal of old door
    • Injury from using tools
    • Exposure to dust and particles
  • 3. Sorting and storage of work materials
    • Tripping
    • Injury from moving heavy items
    • Cuts from sharp objects
  • 4. Measuring the door frame
    • Falling from ladder
    • Eye strain
  • 5. Cutting the new door to size
    • Cutting injury
    • Noise-induced hearing loss
  • 6. Installing hinges on the door
    • Injury from using tools
    • Pinch points
  • 7. Lifting and attaching the door
    • Musculoskeletal injuries
    • Pinch points
  • 8. Checking the door function
    • Pinch points
    • Falling door
  • 9. Applying sealant
    • Chemical exposure
    • Eye irritation
  • 10. Attaching door handle/lock
    • Cutting injury
    • Pinch points
  • 11. Final testing of door function
    • Falling door
    • Pinch points
  • 12. Disposal of old door & cleanup
    • Cutting injury
    • Tripping over materials
  • 13. Inspection
    • Slipping
    • Tripping
  • 14. Documentation
    • Ergonomic hazards from computer use
  • 15. De-brief team
    • Noise pollution
Shopping Cart