Standing Long Hours Safe Work Method Statement (SWMS)

$96.80

The Standing Long Hours Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Standing Long Hours Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Standing Long Hours Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Standing Long Hours Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Standing Long Hours Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Standing Long Hours Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Standing Long Hours Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Incorrect posture
    • Lack of personal protective equipment (PPE)
  • 2. Ground Check
    • Slippery surface
    • Uneven ground
  • 3. Standing Position
    • Incorrect body alignment
    • Floor hardness
  • 4. Duration of Stand
    • Fatigue
    • Circulation problems
  • 5. Footwear Check
    • Inadequate footwear
    • Foot pain
  • 6. Regular Breaks
    • Forget to break
    • Ignoring discomfort
  • 7. Stretching
    • Incorrect technique
    • Over-stretching
  • 8. Hydration
    • Dehydration
    • Ignoring thirst signals
  • 9. Body Mechanics
    • Incorrect lifting
    • Repetitive motions
  • 10. Work Area Design
    • Inadequate lighting
    • Poor ergonomics
  • 11. Equipment Adjustment
    • Poorly set up equipment
    • Unstable podium
  • 12. Task Rotation
    • Non-compliance
    • Fatigue from repetitive tasks
  • 13. Training
    • Poor knowledge of standing technique
    • Misunderstanding instructions
  • 14. Safety Checks
    • Overlooking hazards
    • Lack of maintenance
  • 15. Reporting Problems
    • Fear of reporting
    • Inaccurate incident description
  • 16. Use of Assistive Devices
    • Improper use
    • Equipment malfunction
  • 17. End of shift procedures
    • Failure to clean area
    • Forget to report issues
  • 18. Post-Work Recovery
    • Ignoring persistent discomfort
    • Lack of rest
  • 19. Follow-up Actions
    • Not addressing reported problems
    • Non-compliance with control measures
  • 20. Review and Improvement
    • Non-compliance
    • Ignoring feedback

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Standing Long Hours Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart