Staircase Cleaning Safe Work Method Statement (SWMS)

$96.80

The Staircase Cleaning Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Staircase Cleaning Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Staircase Cleaning Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Staircase Cleaning Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Staircase Cleaning Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Staircase Cleaning Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Staircase Cleaning Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 10. Equipment dismantling
    • Electrical hazards
    • incorrect handling
  • 11. Post-cleaning inspection
    • Trip and fall risks
    • missed areas
  • 12. Documentation & reporting
    • Data misinterpretation
    • lack of visibility
  • 13. Equipment maintenance
    • Electric shocks
    • improper setting
  • 14. Staff training
    • Inadequate knowledge
    • human error
  • 15. Regular risk assessment
    • Missed hazards
    • inadequate follow-up
  • 16. Emergency procedures
    • Lack of awareness
    • slow reaction time
  • 17. Incident reporting
    • Inaccurate data
    • lack of consensus
  • 18. Stakeholder communication
    • Miscommunication
    • lack of involvement
  • 19. Policy updates & compliance checks
    • Non-compliance
    • outdated procedures
  • 20. Final audit and closing
    • Missed hazards
    • non-compliance

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Staircase Cleaning Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart