Stage Cylinder Rigging Risk Assessment

$79.50

The Stage Cylinder Rigging Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Stage Cylinder Rigging Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Stage Cylinder Rigging Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate lighting
    • Tripping hazards
  • 2. Pre-Use Inspection
    • Chemical exposure
    • missing safety equipment
  • 3. Manual Handling
    • Musculoskeletal injuries
    • trips and falls
  • 4. Transporting Materials
    • Vehicle collision
    • Manual handling injuries
  • 5. Cylinder Setup
    • Cylinder falling
    • incorrect setup
  • 6. Rigging Attachment
    • Trips and falls
    • Struck by moving object
  • 7. Safety Checks
    • Incorrect usage of equipment
    • Inadequate inspection
  • 8. Lifting Operations
    • Falling objects
    • structural collapse
  • 9. Detachment Procedure
    • Falling objects
    • entanglement hazards
  • 10. Post-Use Inspection
    • Chemical exposure
    • Extreme weather conditions
  • 11. Maintenance
    • Electrical hazards
    • Chemical hazards
  • 12. Storage Procedures
    • Fire hazard
    • Structural instability
  • 13. Emergency Procedures
    • Panic reactions
    • Incorrect procedures
  • 14. Decontamination Process
    • Chemical exposure from cleaning products
    • slips and falls
  • 15. Waste Disposal
    • Exposure to dangerous substances
    • Incorrect disposal procedures
  • 16. Reporting
    • Inaccurate information
    • delayed reporting
  • 17. Decompression Stops
    • Nitrogen narcosis
    • Barotrauma
  • 18. Cylinder Removal Procedure
    • Musculoskeletal injuries
    • Trips and falls
  • 19. Decommissioning Process
    • Release of harmful substances
    • Fire hazard
  • 20. Clean-Up Operations
    • Exposure to hazardous substances
    • Slips and falls due to wet surfaces
Shopping Cart