Spire Assembly Risk Assessment

$79.50

The Spire Assembly Risk Assessment features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Spire Assembly Risk Assessment covers:

  1. A detailed breakdown of work activities with potential hazards identified
  2. A comprehensive risk evaluation matrix to assess initial and residual risks
  3. Step-by-step control measures and guidelines to minimise hazards
  4. Pre-work checks and documentation requirements to ensure compliance
  5. And more. Please check details below
Category:

Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.

Key Features:

Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.

Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.

Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.

Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.

Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.

Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.


The Spire Assembly Risk Assessment includes the following job steps and related potential hazards:

  • 1. Preparation
    • Poor ergonomic posture
    • repetitive strain injuries
  • 2. Component Handling
    • Sharp edges causing injuries
    • heavy loads leading to musculoskeletal injuries
  • 3. Assembly Process
    • Finger entrapment
    • electrical hazards
  • 4. Component Installation
    • Falling objects
    • confined spaces
    • chemical exposure
  • 5. Soldering
    • Burns
    • toxic fumes
  • 6. Cleaning
    • Exposure to harmful chemicals
    • slips and falls
  • 7. Final Inspection
    • Eye strain
    • poor ergonomic posture
  • 8. Packaging
    • Repetitive strain injury
    • manual handling injuries
  • 9. Transportation
    • Traffic accidents
    • poor manual lifting techniques
  • 10. Spire Setup
    • High altitude working hazards
    • falling objects
  • 11. Power Connection
    • Electrical shock
    • fire hazard due to faulty wiring
  • 12. System Check
    • Working with live electricity
    • overexertion
  • 13. Dissasembly and pack up
    • Miscommunication leading to accidents
    • manual handling injuries
  • 14. Post-job clean up
    • Biological waste exposure
    • chemical exposure
  • 15. Equipment maintenance
    • Machine jamming causing finger injuries
    • electrical shock
  • 16. Reporting and Documentation
    • Incorrect data causing miscalculations
    • eye strain
  • 17. Loading/Unloading equipment
    • Fall from heights
    • back injuries due to heavy lifting
  • 18. Waste disposal
    • Improper handling of hazardous waste
    • needle stick injuries
  • 19. Tool storage
    • Trip/fall hazards
    • improper storage leading to falls
  • 20. Site inspection and closure
    • Undetected site risks leading to accidents
    • unsecured work area
Shopping Cart