Sound Pollution Management Safe Work Method Statement (SWMS)

$96.80

The Sound Pollution Management Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Sound Pollution Management Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Sound Pollution Management Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Sound Pollution Management Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Sound Pollution Management Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Sound Pollution Management Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Sound Pollution Management Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Excessive exposure to noise
    • poor ventilation
    • inadequate lighting
  • 2. Equipment setup
    • Faulty equipment
    • overexertion during handling
  • 3. Sound check
    • High decibel levels
    • electrical hazards
  • 4. Monitor sound levels
    • Use of headphones amplifies sound intensities
  • 5. Feedback control and adjustment
    • Prolonged exposure to noise
    • vibration from equipment
  • 6. Replacement/Repair of faulty parts
    • Electrical shocks
    • cuts from sharp objects
  • 7. Rearrangement of equipment
    • Heavy lifting
    • trips or falls
  • 8. Calibration
    • Possible electrical shocks
    • elevated sound levels
  • 9. Recording
    • Long duration of exposure to high decibels
  • 10. Post-recording assessment
    • Auditory fatigue
    • stress from prolonged standing
  • 11. Dismantling of equipment
    • Strains from heavy lifting
    • slips or falls
  • 12. Transportation of equipment
    • Accidents during transportation
    • injury during handling
  • 13. Equipment storage
    • Trips or falls due to cluttered workplace
  • 14. Debrief and evaluation
    • Stress from workload
    • eye strain from reporting procedures
  • 15. Regular maintenance
    • Potential for gaps in safety enforcement
    • possible electrical fires
  • 16. Training and seminars
    • Lack of proper knowledge
    • failure to adapt safety procedures
  • 17. Emergency response planning
    • Inadequate response in emergencies
    • panic situations
  • 18. Regular Health Check ups
    • Unnoticed auditory stress
    • psychological stress
  • 19. Noise pollution assessment
    • Unmitigated sound levels
    • health threats to nearby residents
  • 20. Strict adherence to regulator policies
    • Non-compliance
    • potential violations

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Sound Pollution Management Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart