Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Solar Site Inspection Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Faulty equipment
- tripping hazards
- 2. Site Assessment
- Exposure to sun
- uneven ground
- high wind
- 3. Equipment Loading
- Heavy lifting
- manual handling injuries
- 4. Travel to Site
- Road accidents
- poor weather conditions
- 5. Unloading at Site
- Heavy lifting
- manual handling injuries
- unsuitable ground for unloading
- 6. Site Set Up
- Tripping hazards
- falling objects
- 7. Installation of Solar Panels
- Falling from height
- Electrical shock
- 8. Electrical Connections
- Electrical shocks
- faulty equipment
- 9. System Testing
- Electrical shocks
- system malfunction
- 10. Clean Up and Waste Disposal
- Sharps injuries
- chemical exposure
- 11. Pack Up
- Heavy lifting
- manual handling injuries
- 12. Travel from Site
- Road accidents
- poor weather conditions
- 13. Unloading at Warehouse
- Heavy lifting
- manual handling
- Unsuitable ground for unloading
- 14. Eqipment Maintenance and Repair
- Electric shocks
- Inappropriate use of tools
- 15. Documentation and Reporting
- Incorrect data recording
- Lack of communication
- 16. Client Liaison and Follow-up
- Miscommunication
- lack of customer service skills
- 17. Training and skill development
- Inadequate training
- non-compliance with safety protocols
- 18. Incident Response and Reporting
- Delayed response
- incorrect incident reporting
- 19. Work Health Safety Review
- Non-adherence to work health safety measures
- insufficient knowledge on WHS
- 20. Continuous Improvement Plan
- Failure to improve work practices
- Lack of leadership support