Silica Dust Exposure Prevention Safe Work Method Statement (SWMS)

$96.80

The Silica Dust Exposure Prevention Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Silica Dust Exposure Prevention Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Silica Dust Exposure Prevention Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Silica Dust Exposure Prevention Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Silica Dust Exposure Prevention Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Silica Dust Exposure Prevention Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Silica Dust Exposure Prevention Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate training
    • Equipment malfunction
  • 2. Material Handling
    • Manual handling injuries
    • Aerosols inhalation
  • 3. Using hand tools
    • Noise
    • Vibration
    • Airborne silica dust
  • 4. Cutting materials
    • Sharp implements
    • Airborne silica dust
  • 5. Grinding materials
    • Heat
    • Sparks
    • Airborne silica dust
  • 6. Sweeping
    • Mundane task hazards
    • Airborne silica dust
  • 7. Bag opening and Emptying
    • Airborne silica dust
    • Manual handling injuries
  • 8. Wet Drilling
    • Electric shock
    • Slips
    • trips and falls
    • Airborne silica dust
  • 9. Cleaning up
    • Disposal of hazardous material
    • Slips
    • trips and falls
  • 10. Maintenance
    • Equipment malfunction
    • Exposed moving parts
    • Chemicals exposure
  • 11. Measuring and marking
    • Sharp implements
    • Distractions
  • 12. Installing components
    • Working at heights
    • Manual handling injuries
  • 13. Inspecting work
    • Slips
    • trips and falls
    • Physical strain
  • 14. Packing and Loading
    • Manual handling injuries
    • Dropping materials
  • 15. Site Clean-Up
    • Chemical exposure
    • slips
    • trips and falls
    • Sharp objects
  • 16. Documentation/ Reporting
    • Ergonomic hazards
    • stress from deadlines
  • 17. Debriefing
    • Verbal abuse
    • Slips
    • trips and falls
  • 18. Equipment Storage
    • Manual handling injuries
    • Tripping over equipment
  • 19. Decommissioning
    • Chemical exposure
    • Equipment malfunction
  • 20. Evaluation
    • Stress from performance evaluations
    • Physical strain due to extended hours

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Silica Dust Exposure Prevention Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart