Signage And Barricade Placement Safe Work Method Statement (SWMS)

$96.80

The Signage And Barricade Placement Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Signage And Barricade Placement Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Signage And Barricade Placement Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Signage And Barricade Placement Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Signage And Barricade Placement Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Signage And Barricade Placement Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Signage And Barricade Placement Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate lighting
    • Unstable setup area
  • 2. Checking Equipment
    • Faulty tools
    • Lack of PPE
  • 3. Placement Plan Review
    • Unclear instructions
    • Poor weather conditions
  • 4. Delivery of Barriers
    • Impact injuries
    • Trip hazards
  • 5. Unloading and Storing Barricades
    • Manual handling injuries
    • Slips and falls
  • 6. Placing of Signage
    • Falls from height
    • Incorrect signage placement
  • 7. Placing of Barricades
    • Struck by moving vehicles
    • Incorrect barricade placement
  • 8. Inspection of Setup
    • Incomplete setup
    • Struck by falling objects
  • 9. Making Adjustments
    • Manual handling injuries
    • Injury from tools
  • 10. Cleanup and Removal
    • Trip hazards
    • Manual handling injuries
  • 11. Re-planning for Undone Tasks
    • Miscommunication
    • Over-exertion
  • 12. Handling of Emergency Situations
    • Insufficient first aid
    • Inadequate emergency procedures
  • 13. Waste Disposal
    • Injury from sharp objects
    • Exposure to harmful substances
  • 14. Debriefing
    • Miscommunication
    • Emotional stress
  • 15. Reporting and Documentation
    • Inaccuracy in reporting
    • Neglecting documentation

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Signage And Barricade Placement Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart