Setting Up Of Load-Bearing Structures Safe Work Method Statement (SWMS)

$96.80

The Setting Up Of Load-Bearing Structures Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Setting Up Of Load-Bearing Structures Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Setting Up Of Load-Bearing Structures Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Setting Up Of Load-Bearing Structures Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Setting Up Of Load-Bearing Structures Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Setting Up Of Load-Bearing Structures Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Setting Up Of Load-Bearing Structures Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Inadequate planning
    • Insufficient safety briefing
  • 2. Site Assessment
    • Uneven ground
    • Presence of overhead power lines
  • 3. Delivery Control
    • Traffic congestion
    • Unsecured loads
  • 4. Equipment Inspection
    • Malfunctioning tools
    • Lack of proper maintenance
  • 5. Unloading
    • Falling materials
    • Strains from lifting
  • 6. Foundation Check
    • Weak soil conditions
    • Misalignment of base points
  • 7. Component Sorting
    • Misplacement of components
    • Tripping hazards
  • 8. Bracing Setup
    • Incorrect placement
    • Inadequate anchor points
  • 9. Structure Assembly
    • Falling components
    • Incorrect assembly
  • 10. Height Work
    • Fall from heights
    • Limited access or egress
  • 11. Load Application
    • Overloading
    • Sudden load shifts
  • 12. Pipework Fitting
    • Leakages
    • Poor joint connections
  • 13. Electrical Layout
    • Electrocution risk
    • Short circuits
  • 14. Scaffold Erection
    • Scaffold collapse
    • Inadequate platform size
  • 15. Barrier Placement
    • Inadequate dust control
    • Insufficient public warnings
  • 16. Weather Adaptation
    • Heavy rain
    • Strong winds
  • 17. Communication
    • Miscommunication between teams
    • Inadequate signal coverage
  • 18. PPE Utilisation
    • Improper use of PPE
    • Failure to wear necessary protective gear
  • 19. Signage Setup
    • Insufficient visibility of signs
    • Misinterpretation of instructions
  • 20. Safety Audit
    • Omitted checklist items
    • Non-compliance with safety standards
  • 21. Final Inspection
    • Missed defects
    • Underestimation of potential stress points
  • 22. Debriefing
    • Failure to document incidents
    • Incomplete feedback
  • 23. Dismantling
    • Collapse risk
    • Damage to components
  • 24. Cleanup
    • Slips and falls
    • Exposure to hazardous materials

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Setting Up Of Load-Bearing Structures Safe Work Method Statement (SWMS) references: