Ensure your workplace remains safe and compliant with our versatile risk assessment templates, designed to meet Australia’s Work Health and Safety (WHS) standards. These professionally crafted documents follow a consistent, structured approach that can be adapted for any industry or task.
Key Features:
• Uniform Structure: Each template includes clearly defined sections for job steps, potential hazards, risk matrices, control measures, and emergency procedures.
• Comprehensive Hazard Identification: Systematically record foreseeable hazards at every stage of your work process—from preparation and equipment checks to final debriefing.
• Customisable Details: Easily insert your organisation’s information, project specifics, and relevant legislative references, ensuring the document meets your unique operational needs.
• Regulatory Compliance: Built to align with Australia’s WHS legislation and Codes of Practice, these templates include guidance notes and reference links to help you stay compliant.
• Emergency Preparedness & Documentation: Integrated sections for emergency response planning and thorough documentation review ensure all critical safety information is captured and easily accessible.
Whether you’re managing a construction site, operating machinery, or overseeing any other workplace activity, our generic risk assessment templates provide a robust framework for identifying risks, implementing effective control measures, and maintaining a safe working environment. Download today to streamline your risk management processes and promote a culture of safety in your organisation.
The Service Elevator Motors Risk Assessment includes the following job steps and related potential hazards:
- 1. Preparation
- Incorrect equipment
- Improper training
- 2. Inspect Area
- Slip and fall
- Electric shock
- 3. Isolate Power
- Electric shock
- Burns from hot parts
- 4. Perform LOTO Procedures
- Failure to Lockout/Tagout
- Unauthorised access
- 5. Remove Motor Housing
- Dropping tools
- Exposed wiring
- 6. Disconnect Motor
- Electric shock
- Incorrect disconnection
- 7. Install new Motor
- Incorrect installation
- Heavy lifting
- 8. Correctly Wire New Motor
- Exposed wiring
- Electric shock
- 9. Test Motor Operation
- Electric shock
- Rotating motor parts
- 10. Replace Motor Housing
- Pinch points
- Closed areas
- 11. Safe Machine Setup
- Incorrect settings
- Unlocked safety features
- 12. Test Load Capacity
- Overloading
- Unsafe operation
- 13. Heat Testing
- Fire
- Burns from hot parts
- 14. Clean Up
- Trips
- Slippery surfaces
- 15. Conduct Final Inspection
- Missed steps in process
- Faulty equipment
- 16. Return to Service
- Unauthorised usage
- Not following procedures
- 17. Record Keeping
- Loss of records
- Inaccurate record keeping
- 18. Power Restore
- Electric shock
- incorrect procedure
- 19. Equipment Check
- Missed maintenance tasks
- Faulty safety devices
- 20. Review Procedures
- Failure to update procedures
- Negligence in following protocol