Sawdust Extraction System Maintenance Safe Work Method Statement (SWMS)

$96.80

The Sawdust Extraction System Maintenance Safe Work Method Statement (SWMS) features:

  1. Instant download
  2. Acceptance Guaranteed
  3. Easy to edit Microsoft Word format so you can add your logo and site specific details
  4. Complies with latest legislation

Specifically, the Sawdust Extraction System Maintenance Safe Work Method Statement (SWMS) covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. And more. Please check details below
Category:

The Sawdust Extraction System Maintenance Safe Work Method Statement is a detailed template that comprehensively addresses all safety requirements for operations. It is pre-filled and ready for immediate use, customizable to meet your site-specific needs.

Need a complete Safety Management System? Click Here to see our range of WHS packages

The Sawdust Extraction System Maintenance Safe Work Method Statement Covers:

  1. Operational guidelines, with a step by step approach to safe work
  2. Possible hazards that may be encountered
  3. Step by step safety procedures to follow
  4. Before work starts – Guidelines and Checks
  5. Safety measures and guides
  6. Operational Safety Checks
  7. Before and After Risk Ratings while carrying out Operations
  8. Sawdust Extraction System Maintenance Risk Assessment
  9. High Risk Work Involved
  10. Emergency Evacuation Procedure
  11. Plant and Equipment
  12. Qualifications and Permits
  13. Specific Personal Protective Equipment (PPE) to be used
  14. Legislation, Codes of Practice and Standards
  15. Company Personnel Sign off form to ensure all personnel acknowledge they have read and understand the SWMS

Note: The BlueSafe Sawdust Extraction System Maintenance Safe Work Method Statement (SWMS) document is highly comprehensive in nature and is not a blank SWMS Template. Download a Sample to check


The Sawdust Extraction System Maintenance Safe Work Method Statement (SWMS) includes the following job steps and related potential hazards:

  • 1. Preparation
    • Manual handling
    • Tripping hazards
  • 2. Inspect Equipment
    • Possible malfunction
    • Electrical shock
  • 3. Clean Work Area
    • Dust exposure
    • Slipping hazard
  • 4. Switch off system
    • Electrical shock
    • Unexpected equipment start
  • 5. Perform regular maintenance
    • Tool injury
    • Dust inhalation
  • 6. Check for blockages
    • Contact with machinery
    • Entrapment
  • 7. Clear Equipment Blockages
    • Rapid machine movement
    • Manual handling strain on body
  • 8. Bagging of extracted sawdust
    • Exposure to dust particulates
    • manual handling
  • 9. Seal sawdust bags
    • Sharp objects injury
    • Chemical exposure from plastic sealing materials
  • 10. Storing of sealed bags
    • Tripping over bags
    • Strain from lifting heavy weights
  • 11. Restoring power to Extraction System
    • Unexpected start of system
    • Electrical shock
  • 12.Continued observation of system
    • Fatigue
    • Prolonged exposure to noise
  • 13.Documenting the maintenance process
    • Eye strain due to extended screen viewing
    • Poor posture while writing
  • 14.Disposal of wasted materials
    • Infections from exposed waste
    • Cuts from hidden sharp items in trash
  • 15.Cleanup and tool storage
    • Tripping over tools left in work area
    • Incorrect manual handling

Each Safe Work Method Statement has specific content that is referenced to, but not limited to a number of authorities such as Codes of Practice, Regulations, Australian Standards or the Act.

The Sawdust Extraction System Maintenance Safe Work Method Statement (SWMS) references:

Ordering only takes a few minutes. Upon ordering completion, a link will be sent to your email address to download your documents, then add your company logo to the top of the header and you’re finished.

Shopping Cart